Proposed Part 200 General Provisions, as related to Part 242

Sections 200.1 through 200.8 remain unchanged

Section 200.9, Table 1 is amended to read as follows:

242-1.2(b)(2) 40 CFR 72.2 (July 1, [2012]2019) *
242-1.2(b)(3) 40 CFR Parts 72 through 78 (July 1, [2012]2019) *
[242-1.2(b)(14) 40 CFR Part 96, subparts AA through II (July 1, 2012) *
242-1.2(b)(14) 40 CFR 51.123(o)(1) or (2) (July 1, 2012) *
242-1.2(b)(14) 40 CFR Part 97, subparts AA through II (July 1, 2012) *
242-1.2(b)(14) 40 CFR 51.123(p) (July 1, 2012) *
242-1.2(b)(14) 40 CFR 52.35 (July 1, 2012) *
242-1.2(b)(15) 40 CFR Part 96, subparts AAAA through IIII (July 1, 2012) *
242-1.2(b)(15) 40 CFR 51.123(aa)(1) or (2) (July 1, 2012) *
242-1.2(b)(15) 40 CFR 51.123(bb)(1) or (2) (July 1, 2012) *
242-1.2(b)(15) 40 CFR 51.123(dd) (July 1, 2012) *
242-1.2(b)(15) 40 CFR Part 97, subparts AAAA through IIII (July 1, 2012) *
242-1.2(b)(15) 40 CFR 51.123(ee) (July 1, 2012) *
242-1.2(b)(15) 40 CFR 52.35 (July 1, 2012) *
242-1.2(b)(16) 40 CFR Part 96, subparts AAA through III (July1, 2012) *
242-1.2(b)(16) 40 CFR 51.124(o)(1) or (2) (July 1, 2012) *
242-1.2(b)(16) 40 CFR Part 97, subparts AAA through III (July 1, 2012) *
242-1.2(b)(16) 40 CFR 51.124(r) (July 1, 2012) *
242-1.2(b)(16) 40 CFR 52.36 (July 1, 2012) *]
242-1.2(b)([39]36) 40 CFR Part 75 (July 1, [2012]2019) *
242-1.2(b)([39]36)(iii) 40 CFR 75.11(b)(2) (July 1, [2012]2019) *
242-1.2(b)(41) 40 CFR Subpart AAAAA Part 97 (July 1, 2019) *
242-1.2(b)(41) 40 CFR Part 52.38(a) (July 1, 2019) *
242-1.2(b)(41) 40 CFR Part 52.38(a)(3) or (4) (July 1, 2019) *
242-1.2(b)(41) 40 CFR Part 52.38(a)(5) (July 1, 2019)
242-1.2(b)(42) 40 CFR Subpart BBBBB Part 97 (July 1, 2019) *
242-1.2(b)(42) 40 CFR Part 52.38(b)(July 1, 2019) *
242-1.2(b)(42) 40 CFR Part 52.38(b)(3) or (4) (July 1, 2019) *
242-1.2(b)(42) 40 CFR Part 52.38(b)(5) (July 1, 2019) *
242-1.2(b)(43) 40 CFR Subpart CCCCC Part 97 (July 1, 2019) *
242-1.2(b)(43) 40 CFR Part 52.39 (a), (b), (d) - (f), (j), (k) (July 1, 2019) *
242-1.2(b)(43) 40 CFR Part 52.39(d) or (e) (July 1, 2019) *
242-1.2(b)(43) 40 CFR Part 52.39(f) (July 1, 2019) *
242-1.2(b)(44) 40 CFR Subpart DDDDD Part 97 (July 1, 2019) *
242-1.2(b)(44) 40 CFR Part 52.39 (a), (c), (g) - (k) (July 1, 2019) *
242-1.2(b)(44) 40 CFR Part 52.39(g) or (h) (July 1, 2019) *
242-1.2(b)(44) 40 CFR Part 52.39(i) (July 1, 2019) *
242-1.2(b)([50]53) Intergovernmental Panel on Climate Change, [Fourth] Fifth Assessment Report, the Science Basis (Working Group I), chapter [2]8, [pages 212 and 213] ([2007]2013) **
242-1.2(b)([55]57) Appendix D of 40 CFR Part 75 (July 1, [2012]2019) *
242-1.2(b)([55]57) 40 CFR Part 75 (July 1, [2012]2019) *
[242-1.2(b)(79) New York State Public Service Commission's Order on Customer-Sited Tier Implementation (June 28, 2006) **
242-1.2(b)(79) New York State Public Service Commission's Order Regarding Retail Renewable Portfolio Standard, Appendix B (September 24, 2004) **]
242-1.[6]5(e)(1)(ii) 40 CFR Part 75.57 (July 1, [2012]2019) *
[242-5.3(a)(1) 21 NYCRR Part 507 (May 2007) **]
242-8.1 40 CFR Part 75 (July 1, [2012]2019) *
242-8.1 40 CFR 72.2 (July 1, [2012]2019) *
242-8.1 40 CFR 75.72(b)(2)(ii) (July 1, [2012]2019) *
242-8.1 40 CFR 75.16(b)(2)(ii)(B) (July 1, [2012]2019) *
242-8.1 40 CFR 75.13 (July 1, [2012]2019) *
242-8.1(a)(1) 40 CFR Part 75, except for equation G1 in appendix G (July 1, [2012]2019) *
242-8.1(a)(2) 40 CFR Part 75 (July 1, [2012]2019) *
242-8.1(c)(1) 40 CFR 75.31(b)(2) or (c)(3) (July 1, [2012]2019) *
242-8.1(c)(1) Section 2.4 of appendix D of 40 CFR Part 75 (July 1, [2012]2019) *
242-8.1(c)(2) Subpart D of 40 CFR Part 75 (July 1, [2012]2019) *
242-8.1(c)(2) 40 CFR Part 75 appendix D (July 1, [2012]2019) *
242-8.1(c)(3)(i) 40 CFR 75.19 (July 1, [2012]2019) *
242-8.1(c)(3)(ii) 40 CFR 75.19 (July 1, [2012]2019) *
242-8.1(c)(3)(iii) 40 CFR 75.19 (July 1, [2012]2019) *
242-8.1(d)(2) 40 CFR Part 75 (July 1, [2012]2019) *
242-8.1(d)(3) 40 CFR Part 75 (July 1, [2012]2019) *
242-8.1(d)(4)(i) 40 CFR Part 75 (July 1, [2012]2019) *
242-8.2(a)(1) 40 CFR Part 75 (July 1, [2012]2019) *
242-8.2(a)(2) 40 CFR 75.21 (July 1, [2012]2019) *
242-8.2(a)(2) Appendix B and appendix D of 40 CFR Part 75 (July 1, [2012]2019) *
242-8.2(c) 40 CFR 75.72(b)(2)(ii) (July 1, [2012]2019) *
242-8.2(c) 40 CFR 75.16(b)(2)(ii)(B) (July 1, [2012]2019) *
242-8.2(c) 40 CFR 75.13 (July 1, [2012]2019) *
242-8.2(c) 40 CFR 75.66 (July 1, [2012]2019) *
242-8.2(c) 40 CFR Part 75 (July 1, [2012]2019) *
242-8.2(d) Appendix D of 40 CFR Part 75 (July 1, [2012]2019) *
242-8.2(d) 40 CFR 75.19 (July 1, [2012]2019) *
242-8.2(d) Subpart E of 40 CFR Part 75 (July 1, [2012]2019) *
242-8.2(d)(1) 40 CFR 75.20 (July 1, [2012]2019) *
242-8.2(d)(2)(i) 40 CFR 75.21 (July 1, [2012]2019) *
242-8.2(d)(2)(i) Appendix B to 40 CFR Part 75 (July 1, [2012]2019) *
242-8.2(d)(2)(i) 40 CFR 75.20(b) (July 1, [2012]2019) *
242-8.2(d)(2)(ii) 40 CFR 75.20(b) (July 1, [2012]2019) *
242-8.2(d)(3) 40 CFR 75.20(b)(5) and (g)(7) (July 1, [2012]2019) *
242-8.2(d)(3)(ii) 40 CFR 75.63 (July 1, [2012]2019) *
242-8.2(d)(3)(iii) 40 CFR 75.20(a)(3) (July 1, [2012]2019) *
242-8.2(d)(3)(iii) 40 CFR Part 75 (July 1, [2012]2019) *
242-8.2(d)(3)(iv) 40 CFR Part 75 (July 1, [2012]2019) *
242-8.2(d)(3)(iv)(a) 40 CFR Part 75 (July 1, [2012]2019) *
242-8.2(d)(3)(iv)(c) 40 CFR Part 75 (July 1, [2012]2019) *
242-8.2(d)(3)(v)(a) 40 CFR 75.20(a)(5)(i) (July 1, [2012]2019) *
242-8.2(d)(3)(v)(a) 40 CFR 75.20(g)(7) (July 1, [2012]2019) *
242-8.2(d)(3)(v)(a)(1) 40 CFR 75.19 (July 1, [2012]2019) *
242-8.2(d)(3)(v)(a)(2) Section 2.1 of appendix A of 40 CFR Part 75 (July 1, [2012]2019) *
242-8.2(e) 40 CFR 75.19(a)(2) (July 1, 2012]2019) *
242-8.2(e) 40 CFR 75.20(h) (July 1, [2012]2019) *
242-8.2(e) 40 CFR 75.20(g) (July 1, [2012]2019) *
242-8.2(f) Subpart E of 40 CFR Part 75 (July 1, [2012]2019) *
242-8.2(f) 40 CFR 75.20(f) (July 1, [2012]2019) *
242-8.3(a) 40 CFR Part 75 (July 1, [2012]2019) *
242-8.3(a) Subpart D of 40 CFR Part 75 (July 1, [2012]2019) *
242-8.3(a) Appendix D of 40 CFR Part 75 (July 1, [2012]2019) *
242-8.3(b) 40 CFR Part 75 (July 1, [2012]2019) *
242-8.4 40 CFR 75.61 (July 1, [2012]2019) *
242-8.5(a) 40 CFR 75.73 (July 1, [2012]2019) *
242-8.5(b) 40 CFR 75.62 (July 1, [2012]2019) *
242-8.5(c) 40 CFR 75.63 (July 1, [2012]2019) *
242-8.5(c) 40 CFR 75.[7]53(e) and (f) (July 1, [2012]2019) *
242-8.5(d)(2) Subpart H of 40 CFR Part 75 (July 1, [2012]2019) *
242-8.5(d)(2) 40 CFR 75.64 (July 1, [2012]2019) *
242-8.5(d)(2) Subpart G of 40 CFR Part 75 (July 1, [2012]2019) *
242-8.5(d)(3)(i) 40 CFR Part 75 (July 1, [2012]2019) *
242-8.5(d)(3)(ii) 40 CFR 75.34(a)(1) (July 1, [2012]2019) *
242-8.5(d)(3)(ii) Appendix B of 40 CFR Part 75 (July 1, [2012]2019) *
242-8.5(d)(3)(iii) Subpart D of 40 CFR Part 75 (July 1, [2012]2019) *
242-8.6(a) 40 CFR 75.66 (July 1, [2012]2019) *
242-8.6(a) 40 CFR Part 75 (July 1, [2012]2019) *
242-8.6(b)(1) 40 CFR 75.66 (July 1, [2012]2019) *
242-8.6(b)(1) 40 CFR Part 75 (July 1, [2012]2019) *
242-8.6(b)(2) 40 CFR 75.66 (July 1, [2012]2019) *
242-8.6(b)(2) 40 CFR Part 75 (July 1, [2012]2019) *
242-8.6(c) 40 CFR 75.66 (July 1, [2012]2019) *
242-8.6(c) 40 CFR 75.72 (July 1, [2012]2019) *
242-8.6(c) 40 CFR 75.71(a)(2) (July 1, [2012]2019) *
242-8.7(e) New York State Renewable Portfolio Standard Biomass Power Guide Version 2.0[September 2011]June 2018 **
[242-10.2(k) ANSI/ASHRAE/IESNA Standard 90.1 (SI Edition)-2013 (2013) **
242-10.2(ag) ANSI/ASHRAE/IESNA Standard 90.1 (SI Edition)-2013 (2013) **]
242-10.2(t) U.S. EPA Method Number 160.4, Methods for the Chemical Analysis of Water and Wastes (MCAWW) (EPA/600/4-79/020)(1971)
[242-10.5(a)(1) 40 CFR Part 60, Subpart Cc and WWW (July 1, 2012) *
242-10.5(b)(1)(i) High-Voltage Switchgear and Controlgear - Part 303: Use and Handling of Sulfur Hexafluoride (SF6) (IEC/TR 62271-303 ed 1.0) (2008) and Electric Power Institute (EPRI), "SF6 Management for Substations (1020014, 2010) (2010) **
242-10.5(c)(3)(viii) U.S. Department of Energy, Technical Guidelines Voluntary Reporting of Greenhouse Gases (1605(b)) Program; Chapter 1, Part 1 Forestry, Emissions (January 2007) **
242-10.5(d)(1)(ii)(a)(1)(i) ANSI/ASHRAE/IESNA Standard 90.1 (SI Edition)-2013, Energy Standard for Buildings Except Low-Rise Residential Buildings (2013) **
242-10.5(d)(1)(ii)(a)(1)(i) ANSI/ASHRAE/IESNA Standard 62.1-2013, Ventilation for Acceptable Indoor Air Quality (2013) **
242-10.5(d)(1)(ii)(a)(1)(ii) Air Conditioner Contractors of America (ACCA) Manual J: Residential Load Calculation (Eighth Edition-Full) (2011) **
242-10.5(d)(1)(ii)(a)(1)(ii) ANSI/ACCA 5 - QI-2010 "HVAC Quality Installation Specification", (2010) **
242-10.5(d)(1)(ii)(a)(2)(i) ANSI/ASHREA/IESNA Standard 90.1-(SI Edition)-2013, Energy Standard for Buildings Except Low-Rise Residential Buildings (2013) **
242-10.5(d)(1)(ii)(a)(2)(i) ANSI/ASHRAE/IESNA Standard 90.1 (SI Edition)-2013 (2013) **
242-10.5(d)(1)(ii)(a)(2)(ii) 2012 International Energy Conservation Code Supplement (2012) **
242-10.5(d)(5)(i)(a) International Performance Measurement & Verification Protocol, Volume I: Concepts and Options for Determining Energy and Water Savings (IPMVP), "Option B. Retrofit Isolation" (2002) **
242-10.5(d)(5)(i)(a) International Performance Measurement & Verification Protocol, Volume I: Concepts and Options for Determining Energy and Water Savings (IPMVP), "Option D. Calibrated Simulation." (2002) **
242-10.5(d)(5)(i)(a) International Performance Measurement & Verification Protocol, Volume I: Concepts and Options for Determining Energy and Water Savings (IPMVP), "Option C. Whole Facility" (2002) **
242-10.5(d)(5)(i)(a) ASHRAE Guideline 14-2002, Measurement of Energy and Demand Savings (2002) **
242-10.5(d)(5)(i)(b) International Performance Measurement & Verification Protocol, Volume III: Concepts and Practices for Determining Energy Savings in New Construction (IPMVP), "Option D. Calibrated Simulation." (2006) **
242-10.5(d)(5)(i)(b) ASHRAE Guideline 14-2002, Measurement of Energy and Demand Savings (2002) **
242-10.5(d)(5)(i)(c) RESNET National Energy Rating Technical Standards and National Home Energy Rating Technical Guidelines, 2013 (Chapter 3 and Appendix A of 2013 Mortgage Industry National Home Energy Rating System Standards) (2013) **
242-10.5(d)(5)(ii) ASHRAE Guideline 14-2002, Measurement of Energy and Demand Savings (2002) **
242-10.5(d)(5)(ii) ANSI/ASHRAE/IESNA Standard 90.1-(SI Edition)-2013 Energy Standard for Buildings Except Low-Rise Residential Buildings (2013) **
242-10.5(d)(5)(ii) RESNET National Energy Rating Technical Standards and National Home Energy Rating Technical Guidelines, 2013 (Chapter 3 and Appendix A of 2013 Mortgage Industry National Home Energy Rating System Standards) (2013) **
242-10.5(d)(5)(iii) ASHRAE Guideline 14-2002, Measurement of Energy and Demand Savings (2002) **
242-10.5(d)(5)(iii) ANSI/ASHRAE/IESNA Standard 90.1 (SI Edition)-2013, Section 11 and Appendix G (2013) **
242-10.5(d)(5)(iii) RESNET National Energy Rating Technical Standards and National Home Energy Rating Technical Guidelines, 2013 (Chapter 3 and Appendix A of 2013 Mortgage Industry National Home Energy Rating System Standards) (2013) **]
242-10.5[(e)](a)(3)(ii) U.S. EPA Method Number 160.3, Methods for the Chemical Analysis of Water and Wastes (MCAWW) (EPA/600/4-79/020) (1971) **
242-10.5[(e)](a)(3)(ii) U.S. EPA Method Number 160.4, Methods for the Chemical Analysis of Water and Wastes CAWW) EPA/600/4-79/020) (1971) **
242-10.5[(e)](a)(3)(iii U.S. EPA, Inventory of U.S. Greenhouse Gas Emissions and Sinks: 1990-2004, Annex 3, Table A-[162]179 (U.S. EPA[, April 2007]) [(April 15, 2007)](April 11, 2019) **
242-10.5[(e)](a)(5)(iii) American Society of Agricultural and Biological Engineers (ASABE) standard (ASAE D384.2, March 2005) (March 2005) **
242-10.5[(e)](a)(5)(iii) U.S. EPA Method Number 160.3, Methods for the Chemical Analysis of Water and Wastes (MCAWW) (EPA/600/4-79/020) (1971) **
242-10.5[(e)](a)(5)(iii) U.S. EPA Method Number 160.4, Methods for the Chemical Analysis of Water and Wastes (MCAWW) (EPA/600/4-79/020) (1971) **