November 15, 2021
The New York State Department of Environmental Conservation (DEC) announced today that Central Rivers Power, licensee of the Theresa Hydroelectric Project (FERC No. 4486), is overseeing a gradual drawdown of the Indian River to allow for replacement of a hydraulically operated 17.5-foot-high spillway gate.
The drawdown will take place over several days to allow for the protection of aquatic life and will last approximately four months.
Andrea C. Pedrick
DCEE, Region 8
6274 East Avon-Lima Rd
Avon, NY 14414