Index of /data/DecDocs/C734138

Icon  Name                                                                                      Size  
[   ] Application.BCP.C734138.2011-07-13.BMS_Restoration_Area.pdf 5.3M [   ] Fact Sheet.BCP.C734138.2012-01-17.RIWP_comment_period.pdf 267K [   ] Fact Sheet.BCP.C734138.2012-08-01.bldg_demo.pdf 1.1M [   ] Report.BCP.C734138.2018-10-31.Trans Proj CCR 01 of 11 Text_Tables_Figures.pdf 18M [   ] Report.BCP.C734138.2019-06-19.Bldg 3 VI Assessment.pdf 7.6M [   ] Report.BCP.C734138.2019-07-23.Phase 1-2 RI Rpt - 01 of 14 - Text Tables Figures.pdf 30M [   ] Report.BCP.C734138.2020-01-13.Bldg 22 PCB IRM CCR.pdf 5.1M [   ] Report.BCP.C734138.2020-03-12.Hi Vac Pilot Test Report.pdf 11M [   ] Report.BCP.C734138.2020-03-25.Bldg 25 Demo CCR - Text Tables FIgures.pdf 17M [   ] Report.BCP.C734138.2020-03-31.GW PDI and Emerg Contams - All Except App B.pdf 27M [   ] Report.BCP.C734138.2020-04-02.Bldg 25 Soil Excavation - Except Attach 5.pdf 9.6M [   ] Report.BCP.C734138.2020-06-12.Addtl Well Install Rpt - 1 of 2 - Redacted.pdf 22M [   ] Report.BCP.C734138.2021-02-05.FWRIA - All Exept App D.pdf 43M [   ] Report.BCP.C734138.2021-10-05.Bldg 3 SVI Mitigation Report.pdf 18M [   ] Report.BCP.C734138.2023-01-13.Supp GWMR.pdf 50M [   ] Report.BCP.C734138.2023-07-28.Bldg 55 TISR GW Mon and System Perf_Q1 2022.pdf 21M [   ] Report.BCP.C734138.2023-08-03.BLD 3 Post ATS Shutdown.pdf 704K [   ] Report.BCP.C734138.2023-10-20.Bldg 55 IRM CCR_Appendix A through E.pdf 51M [   ] Work Plan.BCP.C734138.2013-03-01.RIWP_1of3.pdf 67M [   ] Work Plan.BCP.C734138.2014-10-21.Surface Soil Work Plan with Modifications.pdf 1.8M [   ] Work Plan.BCP.C734138.2015-02-04.Phase 1A RIWP - GW Module - with Mod Letters.pdf 10M [   ] Work Plan.BCP.C734138.2015-05-28.Phase 1A RIWP - Sediment Module with Approval Letter.pdf 1.4M [   ] Work Plan.BCP.C734138.2016-02-10.TW Decomm Plan with Mods.pdf 1.1M [   ] Work Plan.BCP.C734138.2016-02-12.Phase 1A RIWP - SVI Module - with Modifications.pdf 7.1M [   ] Work Plan.BCP.C734138.2016-11-02.Bldg 22 Soil Sampling Plan.pdf 947K [   ] Work Plan.BCP.C734138.2017-02-16.Phase 2 Groundwater RIWP - with Mods.pdf 8.9M [   ] Work Plan.BCP.C734138.2019-04-17.Additional Sediment Sampling WP with Mods.pdf 1.8M [   ] Work Plan.BCP.C734138.2019-10-15.Hi Vac Extraction Pilot Test WP.pdf 8.9M [   ] Work Plan.BCP.C734138.2020-10-19.Bldg 55 IRM Pre-Design Investigation WP with Mods.pdf 7.9M [   ] Work Plan.BCP.C734138.2021-04-15.Bldg 3 SVI Mitigation WP.pdf 2.4M [   ] Work Plan.BCP.C734138.2021-06-04.Bldg 55 IRM Work Plan.pdf 29M [   ] Work Plan.BCP.C734138.2021-11-02.Supplemental GW Investigation WP.pdf 2.2M [   ] Work Plan.BCP.C734138.2022-03-18.Bldg 55 TISR OMM.pdf 110M [   ] Work Plan.BCP.C734138.2022-04-19.Aldehyde Eval Addendum.pdf 15M [   ] Work Plan.BCP.C734138.2022-05-02.Bldg 3 IA Treatment Sys OMM.pdf 11M [   ] Work Plan.BCP.C734138.2022-05-18.Sediment Delineation WP with Modifications.pdf 14M [   ] Work Plan.BCP.C734138.2023-05-15. Bldg 55 TISR Mod #2.pdf 23M [   ] Work Plan.BCP.C734138.2023-10-20.Supp GWM_Addendum #2.pdf 405K