Index of /data/DecDocs/546045
Name Size
Fact Sheet.HW.546045.2009-01-30._Class_2_listing_information.pdf 23K
Fact Sheet.HW.546045.2009-07-27._Remedial Investigation Begins Fact Sheet.pdf 2.3M
Fact Sheet.HW.546045.2010-08-02._Offsite_soil_Interim_Remedial_Measure.pdf 23K
Fact Sheet.HW.546045.2011-02-25._OU-3_Fact_Sheet_for_the_PRAP.pdf 251K
Fact Sheet.HW.546045.2011-03-03.Friedrichsohn_Fact_Sheet_OU3_PRAP.pdf 251K
Fact Sheet.HW.546045.2012-10-02._Onsite_and_offsite_Soil_OU1_PRAP.pdf 720K
Fact Sheet.HW.546045.2020-03-04.Friedrichsohn Cooperage RA Start 03-2020.pdf 287K
Fact Sheet.HW.546045.2021-03-09.Factsheet Remedial Action Start Post COVID 19 with Intro.pdf 462K
Fact Sheet.HW.546045.2021-03-09.Factsheet Remedial Action Start Post COVID 19.pdf 374K
ROD.HW.546045.2011-03-31._OU-3_ROD_Final_Friedrichsohn.pdf 34M
ROD.HW.546045.2012-12-17._OU-1_ROD_Final_Friedrichsohn.pdf 2.3M
Report.HW.546045.2010-04-16._Focused Remedial Investigation Feasibility Study.pdf 8.6M
Report.HW.546045.2015-01-27.Friedrichsohn Pre-Design Investigation Report for OU-1 and upland OU-3.pdf 11M
Report.HW.546045.2015-04-10.OU-3 Canal Sediments Pre-Design Investigation Report.pdf 15M
Report.HW.546045.2016-03-24.Preliminary_Remedial_Design_Report for OU-1 and OU-3.pdf 20M
Report.HW.546045.2019-02-04.Friedrichsohn Remedial Design Report final.pdf 162M
Report.HW.546045.2019-02-05.Friedrichsohn RA Tech Bid Package.pdf 20M
Report.HW.546045.2021-03-11.Friedrichsohn Cooperage RA Public Meeting 2021-03-11.pdf 3.4M