Index of /data/DecDocs/241006

Icon  Name                                                                                                        Size  
[   ] Agreement.HW.241006.1971-04-16.Agreement.pdf 198K [   ] Agreement.HW.241006.1982-12-13.SettlementAgreementCovering900DayOptionProperties.pdf 122K [   ] Consent Order.HW.241006.1989-09-21.OrderOnConsentIndexW2-0081-87-06.pdf 489K [   ] Consent Order.HW.241006.1998-02-01.Consent_order_OU1_executed.pdf 1.1M [   ] Consent Order.HW.241006.1998-02-04.Consent_Order_and_Modification.pdf 696K [   ] Consent Order.HW.241006.2010-05-10.Untitled_20140827141933.pdf 4.5M [   ] Fact Sheet.HW.241006.2007-03-09.Untitled_20140827141941.pdf 369K [   ] Fact Sheet.HW.241006.2008-07-29.OU3_start_of_construction.pdf 895K [   ] Fact Sheet.HW.241006.2009-02-27.OU4_PRAP_final.pdf 1.1M [   ] Fact Sheet.HW.241006.2010-02-01.Announce_OU-6_PRAP_Final.pdf 740K [   ] PRAP.HW.241006.1997-06-13.OU-1 PRAP.pdf 1.2M [   ] PRAP.HW.241006.2007-02-20.OU3 Prap_Figure1.pdf 746K [   ] PRAP.HW.241006.2007-02-20.OU3PRAPTables.pdf 168K [   ] PRAP.HW.241006.2007-02-20.OU3_PRAP_Fina.pdf 104K [   ] PRAP.HW.241006.2007-02-20.OU3_Prap_Figures2-13.pdf 1.2M [   ] PRAP.HW.241006.2009-02-27.Amtrak_SSY_OU4_PRAP.pdf 18M [   ] PRAP.HW.241006.2010-01-31.PRAP_Final_OU-6.pdf 8.1M [   ] PRAP.HW.241006.2012-02-15.OU 5.pdf 4.8M [   ] ROD.HW.241006.1997-08-01.amtrak_sunnyside_yard_ou1.pdf 2.2M [   ] ROD.HW.241006.1997-08-01.amtrak_sunnyside_yard_ou2.pdf 1.1M [   ] ROD.HW.241006.1997-08-13.OU 1_record_of_decision.pdf 5.3M [   ] ROD.HW.241006.1997-08-30.amtrak_sunnyside_yard_OU1.pdf 2.2M [   ] ROD.HW.241006.1997-11-19.record_of_decision.pdf 6.2M [   ] ROD.HW.241006.1997-11-30.amtrak_sunnyside_yard_OU2.pdf 1.1M [   ] ROD.HW.241006.1998-04-20.OU-1 ROD.pdf 2.2M [   ] ROD.HW.241006.2007-03-28.amtrak_sunnyside_yard_OU3.pdf 1.0M [   ] ROD.HW.241006.2009-03-31.Final_ROD_Amtrak_SSY_OU_4.pdf 35M [   ] ROD.HW.241006.2010-03-30.FinalROD_amtrakSSY_OU6_cleancopy.pdf 9.2M [   ] ROD.HW.241006.2010-03-30.ROD_amtrakSSY_OU6_final.pdf 9.1M [   ] ROD.HW.241006.2012-03-27.OU_5.pdf 4.8M [   ] ROD.HW.241006.2012-03-28.OU5_ROD.pdf 3.2M [   ] Report.HW.241006.1983-12-22.ResultsOfPCBAnalysis.pdf 85K [   ] Report.HW.241006.1985-08-22.PCBEvaluation.pdf 65K [   ] Report.HW.241006.1985-12-02.CertificateOfAnalysis.pdf 178K [   ] Report.HW.241006.1986-06-01.Geraghty_Miller_Report.pdf 7.3M [   ] Report.HW.241006.1986-06-01.results_of_hydrogeologic_investigation_at_the_amtrak_sunnyside_queens_new.pdf 2.1M [   ] Report.HW.241006.1986-08-01.HealthHazardEvaluation.pdf 500K [   ] Report.HW.241006.1991-09-26.MaterialProfileSheet.pdf 531K [   ] Report.HW.241006.1991-11-21.AnalyticalReport.pdf 1.8M [   ] Report.HW.241006.1991-11-21.PCBAnalyticalDataFromMetroShopArea.pdf 834K [   ] Report.HW.241006.1991-11-22.USTRemovalAnalyticalReport.pdf 2.2M [   ] Report.HW.241006.1991-11-29.USTRemovalAnalyticalReport.pdf 1.7M [   ] Report.HW.241006.1992-01-22.VolumeIII_PhaseI_RI_Report.pdf 1.6M [   ] Report.HW.241006.1992-01-22.VolumeII_PhaseI_RI_Report.pdf 4.4M [   ] Report.HW.241006.1992-01-22.VolumeI_RI_Report.pdf 8.4M [   ] Report.HW.241006.1992-02-15.VolumeIV_PhaseII_RI_Report.pdf 5.4M [   ] Report.HW.241006.1992-03-27.PCBDataPackage.pdf 1.5M [   ] Report.HW.241006.1992-10-23.Area_2_UST_Investigation_Report.pdf 16M [   ] Report.HW.241006.1993-02-19.AnalyticalResultsZ0099.pdf 3.0M [   ] Report.HW.241006.1993-02-25.AnalyticalResults1Of6Z0060.pdf 3.5M [   ] Report.HW.241006.1993-02-25.AnalyticalResults2Of6Z0060.pdf 5.2M [   ] Report.HW.241006.1993-02-25.AnalyticalResults3Of6Z0060.pdf 6.4M [   ] Report.HW.241006.1993-02-25.AnalyticalResults4Of6Z0060.pdf 8.7M [   ] Report.HW.241006.1993-02-25.AnalyticalResults5Of6Z0060.pdf 5.7M [   ] Report.HW.241006.1993-02-25.AnalyticalResults6Of6Z0060.pdf 9.7M [   ] Report.HW.241006.1993-03-10.AnalyticalResults1Of2A0060.pdf 7.4M [   ] Report.HW.241006.1993-03-10.AnalyticalResults2Of2A0060.pdf 6.7M [   ] Report.HW.241006.1993-03-16.AnalyticalResults1Of2B0060.pdf 4.4M [   ] Report.HW.241006.1993-03-16.AnalyticalResults2Of2B0060.pdf 7.1M [   ] Report.HW.241006.1993-03-17.AnalyticalResults1Of6Z0148.pdf 4.0M [   ] Report.HW.241006.1993-03-17.AnalyticalResults2Of6Z0148.pdf 6.6M [   ] Report.HW.241006.1993-03-17.AnalyticalResults3Of6Z0148.pdf 6.7M [   ] Report.HW.241006.1993-03-17.AnalyticalResults4Of6Z0148.pdf 6.6M [   ] Report.HW.241006.1993-03-17.AnalyticalResults5Of6Z0148.pdf 5.2M [   ] Report.HW.241006.1993-03-17.AnalyticalResults6Of6Z0148.pdf 8.0M [   ] Report.HW.241006.1993-08-04.AddendumToAug1992PhaseIIRemedialInvestigationWorkPlan.pdf 5.2M [   ] Report.HW.241006.1994-08-31.second_and_third_quarter_progress_report_interim_remedial_measures_sys.pdf 400K [   ] Report.HW.241006.1994-09-06.results_of_sewer_sampling_program_and_oil-water_separator_inspection_a.pdf 1.6M [   ] Report.HW.241006.1994-10-06.results_of_the_additional_delineation_of_areas_of_concern_a-8_a-9_and_.pdf 1.4M [   ] Report.HW.241006.1994-10-11.fourth_quarter_progress_report_interim_remedial_measures_system_in_are.pdf 244K [   ] Report.HW.241006.1994-10-13.progress_report_for_the_period_august_24-october_13_1994.pdf.pdf 321K [   ] Report.HW.241006.1995-01-01.BaselineRiskAssessmentVol2Of3.pdf 7.4M [   ] Report.HW.241006.1995-01-01.BaselineRiskAssessmentVol3Of3.pdf 3.2M [   ] Report.HW.241006.1995-01-12.results_of_the_soil_sampling_along_the_ductline_trench_route_to_suppor.pdf 1.8M [   ] Report.HW.241006.1995-02-15.PhaseIIRemedialInvestigation2Of5.pdf 4.0M [   ] Report.HW.241006.1995-02-15.PhaseIIRemedialInvestigation3Of5.pdf 4.6M [   ] Report.HW.241006.1995-02-15.VolumeIII_PhaseII_RI_Report.pdf 4.3M [   ] Report.HW.241006.1995-02-15.VolumeII_PhaseII_RI_Report.pdf 2.4M [   ] Report.HW.241006.1995-02-15.VolumeI_PhaseII_RI_Report.pdf 2.9M [   ] Report.HW.241006.1995-02-15.VolumeV_PhaseII_RI_Report.pdf 5.4M [   ] Report.HW.241006.1995-02-15.phase_2_remedial_investigation.pdf.pdf 10M [   ] Report.HW.241006.1995-09-20.PreliminaryRemediationCostEstimatesForPCBContaminatedSoils.pdf 23M [   ] Report.HW.241006.1996-05-30.Supplemental_PhaseII_RI_Report.pdf 5.1M [   ] Report.HW.241006.1996-05-30.supplement_for_phase_2_remedial_investigation_report.pdf.pdf 577K [   ] Report.HW.241006.1996-08-29.phase_1_soil_sampling_results_in_support_of_construction_of_the_new_en.pdf 263K [   ] Report.HW.241006.1996-09-30.progress_report_interim_remedial_measures_system_in_area_1.pdf 224K [   ] Report.HW.241006.1996-10-07.phase_2_soil_sampling_results_in_support_of_construction_of_the_new_en.pdf 304K [   ] Report.HW.241006.1996-11-01.summary_of_the_results_for_the_june-july_1996_sewer_sampling_program_a.pdf 3.3M [   ] Report.HW.241006.1996-12-03.Limited_PhaseII_ESA_Report.pdf 3.5M [   ] Report.HW.241006.1996-12-03.OU-1 Limited Phase II Site Assessment HSTF.pdf 5.1M [   ] Report.HW.241006.1997-01-22.site-specific_cleanup_levels.pdf.pdf 2.1M [   ] Report.HW.241006.1997-01-31.ScopeOfWorkForTheFocusedRemedialInvestigationOfOU-2.pdf 5.9M [   ] Report.HW.241006.1997-04-18.OU-1 Feasibility Study.pdf 2.4M [   ] Report.HW.241006.1997-04-18.OU-1_FS.pdf 2.4M [   ] Report.HW.241006.1997-06-13.focused_remedial_investigation_for_operable_unit_2.pdf.pdf 5.5M [   ] Report.HW.241006.1997-08-06.general_sampling_and_analysis_plan_to_support_high_speed_trainset_faci.pdf 3.5M [   ] Report.HW.241006.1997-08-28.OU-2_FS.pdf 2.3M [   ] Report.HW.241006.1997-08-28.operable_unit_2_feasibility_study.pdf.pdf 3.5M [   ] Report.HW.241006.1997-08-28.summary_of_the_results_for_the_expanded_sewer_system_investigation.pdf.pdf 2.3M [   ] Report.HW.241006.1997-10-01.results_of_lead_track_no.6_soil_investigation.pdf.pdf 3.3M [   ] Report.HW.241006.1997-10-01.summary_of_results_from_additional_soil_samples_collected_in_operable_.pdf 1.5M [   ] Report.HW.241006.1997-10-08.OU-1 Remedial Design Report.pdf 6.1M [   ] Report.HW.241006.1997-10-08.OU-1_RD_Report.pdf 7.8M [   ] Report.HW.241006.1998-03-11.OU-1 Remedial Action Report.pdf 16M [   ] Report.HW.241006.1998-03-11.OU1_Remedial_Action_Report.pdf 16M [   ] Report.HW.241006.1998-03-11.operable_unit_1_remedial_action_report.pdf 14M [   ] Report.HW.241006.1998-03-18.ResultsOfSoilSamplingInSelectedWorkAreasLocatedInOU-3NON-FOIL.pdf 13M [   ] Report.HW.241006.1998-04-14.ResultsOfSoilSamplingToCharacterizeTheSoilAdjacentToTheSewerPipeBeneathOU-1.pdf 461K [   ] Report.HW.241006.1998-04-15.ConstructionCompletionCertificationReportCheckListNON-FOIL.pdf 1.6M [   ] Report.HW.241006.1998-05-19.soil-sample-result-from-ou4.pdf 1.8M [   ] Report.HW.241006.1998-05-29.RemedialInvestigation.pdf 321K [   ] Report.HW.241006.1999-05-14.operable_unit_6_remedial_investigation_report.pdf 5.3M [   ] Report.HW.241006.1999-07-16.ClosureReportForOU-4.pdf 4.5M [   ] Report.HW.241006.2001-06-01.construction_safety_and_health_plan.pdf 6.8M [   ] Report.HW.241006.2001-06-26.supplemental_environmental_site_investigation_findings_report_summary.pdf 12M [   ] Report.HW.241006.2001-12-28.supplemental_environmental_site_investigation_findings_report_summary.pdf 4.4M [   ] Report.HW.241006.2002-01-01.environmental_status_and_construction_plan_for_the_queens_alignment.pdf 14M [   ] Report.HW.241006.2002-01-01.findings_report_for_the_environmental_site_investigation_of_the_existing.pdf 41M [   ] Report.HW.241006.2002-09-01.supplemental_findings_report_for_the_environmental_site_investigation_of.pdf 12M [   ] Report.HW.241006.2002-12-01.supplemental_environmental_site_investigation_findings_report_summary_for.pdf 32M [   ] Report.HW.241006.2004-09-01.ScopingDocumentOU-6RI.pdf 335K [   ] Report.HW.241006.2005-05-27.VolumeIII_OU-3_RI_Report.pdf 11M [   ] Report.HW.241006.2005-05-27.VolumeII_OU-3_RI_Report.pdf 22M [   ] Report.HW.241006.2005-05-27.VolumeI_OU-3_RI_Report.pdf 18M [   ] Report.HW.241006.2005-12-06.OU-3_FS.pdf 16M [   ] Report.HW.241006.2006-09-01.supplemental_envirnomental_site_investigation_findings_report_summary.pdf 25M [   ] Report.HW.241006.2007-06-01.mta_lirr_esa_environmental_status_and_construction_plan _for_the_queens_a.pdf 2.6M [   ] Report.HW.241006.2008-04-01.construction_contamination_site_management_plan_and_final_stipulations_li.pdf 31M [   ] Report.HW.241006.2008-10-02.OU4-Remedial_Investigation-Vol_ I.pdf 35M [   ] Report.HW.241006.2008-10-02.OU4-Remedial_Investigation-Vol_II.pdf 8.8M [   ] Report.HW.241006.2009-01-30.OU-4_Feasibility_Study.pdf 8.2M [   ] Report.HW.241006.2009-07-23.3000gal_UST_Closure.pdf 7.6M [   ] Report.HW.241006.2009-11-12.RI_FS_Final_OU-6.pdf 22M [   ] Report.HW.241006.2010-10-07.Pilot_Study_Report_for_OU-3.pdf 1.6M [   ] Report.HW.241006.2011-01-19.MH16_soil_Analytical_data.pdf 194K [   ] Report.HW.241006.2011-03-24.Pilot_Study_and_Conceptual_Design_Report_For_OU3.pdf 2.0M [   ] Report.HW.241006.2019-07-17.PCB Zone 1-2-and-3 OU-4_CCR.pdf 203M [   ] Report.HW.241006.2022-05-20.CCR_OU 5.pdf 21M [   ] Work Plan.HW.241006.1989-03-14.workplan_for_the_remedial_investigation_and_feasibility_study.pdf 2.6M [   ] Work Plan.HW.241006.1991-10-10.Area_2_UST_Removal_Work_Plan.pdf 267K [   ] Work Plan.HW.241006.1993-06-17.work_plan_for_the_additional_investigation_of_the_sewer_system.pdf 2.3M [   ] Work Plan.HW.241006.1994-06-27.workplan_for_the_preparation_of_interim_remedial_measure_design_repo.pdf 518K [   ] Work Plan.HW.241006.1997-03-21.work_plan_for_the_phase_3_interim_remedial_measure_system_in_operabl.pdf 284K [   ] Work Plan.HW.241006.1997-05-29.work_plan_for_the_declineation_of_lead_track_no_6.pdf 3.1M [   ] Work Plan.HW.241006.1999-01-13.WorkPlanForTheOU-3RemedialInvestigation.pdf 15M [   ] Work Plan.HW.241006.1999-06-08.irm-and-general-sampling-and_analysis-for-new-construction-ou4.pdf 5.1M [   ] Work Plan.HW.241006.2001-08-29.work_plan_for_the_operable_unit_3_feasibility_study.pdf 3.1M [   ] Work Plan.HW.241006.2003-08-01.addenbdum_to_work_plan_for_the_operable_unit_3_remedial_investigatio.pdf 1.2M [   ] Work Plan.HW.241006.2003-09-26.demolition_work_plan_and_case-specific_bud_request.pdf 1.3M [   ] Work Plan.HW.241006.2004-02-10.draft_pre-design_study_work_plan_for_operable_unit_3.pdf 1.6M [   ] Work Plan.HW.241006.2004-07-01.InterimRemedialMeasureConceptualDesignPlan.pdf 20M [   ] Work Plan.HW.241006.2007-10-19.OU-3_RAWP.pdf 14M [   ] Work Plan.HW.241006.2009-02-09.ESA_ConstructionContaminationSMP.pdf 9.8M [   ] Work Plan.HW.241006.2009-08-06.OU-3_Pilot_Study_WP.pdf 406K [   ] Work Plan.HW.241006.2009-09-24.Final_RAWP_OU4.pdf 12M [   ] Work Plan.HW.241006.2009-09-24.RAWP_Appendix_A_HASP.pdf 4.6M [   ] Work Plan.HW.241006.2009-09-24.RAWP_Appendix_B_CAMP.pdf 177K [   ] Work Plan.HW.241006.2009-09-24.Remedial_Action_Work_Plan-final_OU4.pdf 14M [   ] Work Plan.HW.241006.2010-05-13.Draft_RIWP_OU-5.pdf 19M [   ] Work Plan.HW.241006.2010-05-13.Final_RIWP_OU-5.pdf 12M [   ] Work Plan.HW.241006.2010-06-11.Final_IRMWP_proposed_warehouse_construction_area_OU4.pdf 4.8M [   ] Work Plan.HW.241006.2010-07-01.Final_IRMWP_PCB_Zones_5-9_OU4.pdf 4.5M [   ] Work Plan.HW.241006.2010-08-31.Community_Air_Monitoring_Plan_CAMP.pdf 267K [   ] Work Plan.HW.241006.2010-12-22.OU-3_Pilot_Well_Logs.pdf 1.1M [   ] Work Plan.HW.241006.2011-07-26.Revised-Remedial-Design-Remedial Action.pdf 4.3M [   ] Work Plan.HW.241006.2011-08-23.IRM_Work_Plan_for_OU-5.pdf 341K [   ] Work Plan.HW.241006.2012-03-15.Addendum-to-Revised-RD-RA.pdf 535K [   ] Work Plan.HW.241006.2013-11-07.OU-3_OM&M_Manual.pdf 94M [   ] Work Plan.HW.241006.2017-01-03.OU 3 SPH Surfactant Enhanced Recovery WP.pdf 1.2M [   ] Work Plan.HW.241006.2019-09-05.Delineation-Spill-1905385.pdf 452K [   ] Work Plan.HW.241006.2022-01-10.Excavation Work Plan in Operable Unit 3 and 4.pdf 113M