Express Terms Part 200, General Provisions, as related to CAIR
Sections 200.1 through 200.8 remain unchanged.
Table 1 of existing Section 200.9 is amended to include the following:
| Regulation | Referenced Material | Availability | |
|---|---|---|---|
| 243-1.2(b)(3) | 40 CFR Parts 72-78 (July 1, 2006) | * | |
| 243-1.2(b)(3) | Clean Air Act 42 U.S.C. Section 7651-7651o (2000) | * | |
| 243-1.2(b)(12) | 40 CFR Part 51.123 (July 1, 2006) | * | |
| 243-1.2(b)(12) | 40 CFR Part 97.101-188 (July 1, 2006) | * | |
| 243-1.2(b)(12) | 40 CFR Part 52.35 (July 1, 2006) | * | |
| 243-1.2(b)(13) | 40 CFR Part 51.123 (July 1, 2006) | * | |
| 243-1.2(b)(13) | 40 CFR Part 97 (July 1, 2006) | * | |
| 243-1.2(b)(13) | 40 CFR Part 51.121(p) (July 1, 2006) | * | |
| 243-1.2(b)(13) | 40 CFR Part 51.121(b)(2)(ii)(E) (July 1, 2006) | * | |
| 243-1.2(b)(19) | 40 CFR 51.123 (July 1, 2006) | * | |
| 243-1.2(b)(19) | 40 CFR Part 97 (July 1, 2006) | * | |
| 243-1.2(b)(19) | 40 CFR Part 51.123(ee) (July 1, 2006) | * | |
| 243-1.2(b)(19) | 40 CFR Part 52.35 (July 1, 2006) | * | |
| 243-1.2(b)(25) | 40 CFR 51.124 (July 1, 2006) | * | |
| 243-1.2(b)(25) | 40 CFR Part 97 (July 1, 2006) | * | |
| 243-1.2(b)(25) | 40 CFR Part 52.36 (July 1, 2006) | * | |
| 243-1.2(b)(35) | 40 CFR Part 75 (July 1, 2006) | * | |
| 243-1.2(b)(35)(iv) | 40 CFR 75.11(b)(2) (July 1, 2006) | * | |
| 243-1.2(b)(51) | 40 CFR Part 75 (July 1, 2006) | * | |
| 243-1.2(b)(62) | 40 CFR 75.22 (July 1, 2006) | * | |
| 243-1.2(b)(67) | Clean Air Act 42 U.S.C. Section 7429(g)(1) (2000) | * | |
| 243-1.2(b)(68) | Clean Air Act 42 U.S.C. Section 7661a(c) (2000) | * | |
| 243-1.2(b)(69) | 40 CFR 51.123(aa)(1) and (2) and (bb) and (dd) (July 1, 2006) | * | |
| 243-1.4(c)(1)(iii)(a) | 40 CFR Part 75 (July 1, 2006) | * | |
| 243-1.6(d)(1) | Clean Air Act 42 U.S.C. Section 7401 - 7671(q) (2000) | * | |
| 243-1.6(d)(2) | Clean Air Act 42 U.S.C. Section 7401 - 7671(q) (2000) | * | |
| 243-1.8 | 40 CFR Part 78 (July 1, 2006) | * | |
| 243-6.5(d)(2) | Clean Air Act 42 U.S.C. Section 7401 - 7671(q) (2000) | * | |
| 243-8.1 | 40 CFR Part 75 (July 1, 2006) | * | |
| 40 CFR 72.2 (July 1, 2006) | * | ||
| 243-8.1(a)(1) | 40 CFR 75 (July 1, 2006) | * | |
| 243-8.1(a)(2) | 40 CFR Part 75 (July 1, 2006) | * | |
| 243-8.1(c) | 40 CFR Part 75 (July 1, 2006) | * | |
| 243-8.1(d)(2) | 40 CFR Part 75 (July 1, 2006) | * | |
| 243-8.1(d)(3) | 40 CFR Part 75 (July 1, 2006) | * | |
| 243-8.1(d)(4)(ii) | 40 CFR Part 75 (July 1, 2006) | * | |
| 243-8.1(e) | 40 CFR Part 75 (July 1, 2006) | * | |
| 243-8.2(a)(1) | 40 CFR Part 75 (July 1, 2006) | * | |
| 243-8.2(a)(2) | 40 CFR Part 75 (July 1, 2006) | * | |
| 243-8.2(c) | 40 CFR Part 75 (July 1, 2006) | * | |
| 243-8.2(d) | 40 CFR Part 75 (July 1, 2006) | * | |
| 243-8.2(d)(1) | 40 CFR Part 75 (July 1, 2006) | * | |
| 243-8.2(d)(2) | 40 CFR Part 75 (July 1, 2006) | * | |
| 243-8.2(d)(3) | 40 CFR Part 75 (July 1, 2006) | * | |
| 243-8.2(d)(3)(ii) | 40 CFR Part 75 (July 1, 2006) | * | |
| 243-8.2(d)(3)(iii) | 40 CFR Part 75 (July 1, 2006) | * | |
| 243-8.2(d)(3)(iv) | 40 CFR Part 75 (July 1, 2006) | * | |
| 243-8.2(d)(3)(iv)(a) | 40 CFR Part 75 (July 1, 2006) | * | |
| 243-8.2(d)(3)(iv)(c) | 40 CFR Part 75 (July 1, 2006) | * | |
| 243-8.2(d)(3)(v)(a) | 40 CFR Part 75 (July 1, 2006) | * | |
| 243-8.2(d)(3)(v)(a)(1) | 40 CFR 72.2 (July 1, 2006) | * | |
| 243-8.2(d)(3)(v)(a)(2) | 40 CFR Part 75, Appendix A (July 1, 2006) | * | |
| 243-8.2(d)(3)(v)(a)(3) | 40 CFR Part 75, Appendix A (July 1, 2006) | * | |
| 243-8.2(d)(3)(v)(a)(4) | 40 CFR Part 75, Appendix D (July 1, 2006) | * | |
| 243-8.2(d)(3)(v)(a)(5) | 40 CFR Part 75, Appendix E (July 1, 2006) | * | |
| 40 CFR 72.2 (July 1, 2006) | * | ||
| 243-8.2(e) | 40 CFR Part 75 (July 1, 2006) | * | |
| 243-8.2(f) | 40 CFR Part 75 (July 1, 2006) | * | |
| 243-8.3(a) | 40 CFR Part 75 (July 1, 2006) | * | |
| 243-8.3(b) | 40 CFR Part 75 (July 1, 2006) | * | |
| 243-8.4 | 40 CFR Part 75 (July 1, 2006) | * | |
| 243-8.5(a) | 40 CFR Part 75 (July 1, 2006) | * | |
| 243-8.5(b) | 40 CFR Part 75 (July 1, 2006) | * | |
| 243-8.5(c) | 40 CFR Part 75 (July 1, 2006) | * | |
| 243-8.5(d)(1) | 40 CFR Part 75 (July 1, 2006) | * | |
| 243-8.5(d)(2)(i) | 40 CFR Part 75 (July 1, 2006) | * | |
| 243-8.5(d)(2)(ii) | 40 CFR Part 75 (July 1, 2006) | * | |
| 243-8.5(d)(3) | 40 CFR Part 75 (July 1, 2006) | * | |
| 243-8.5(d)(4) | 40 CFR Part 75 (July 1, 2006) | * | |
| 243-8.5(e)(1) | 40 CFR Part 75 (July 1, 2006) | * | |
| 243-8.5(e)(2) | 40 CFR Part 75 (July 1, 2006) | * | |
| 243-8.5(e)(3) | 40 CFR Part 75 (July 1, 2006) | * | |
| 243-8.6(a) | 40 CFR Part 75 (July 1, 2006) | * | |
| 243-8.6(b)(1) | 40 CFR Part 75 (July 1, 2006) | * | |
| 243-8.6(b)(2) | 40 CFR Part 75 (July 1, 2006) | * | |
| 243-9.1(c) | 40 CFR 72.8 (July 1, 2006) | * | |
| 243-9.4(b)(2) | 40 CFR 72.8 (July 1, 2006) | * | |
| 244-1.2(b)(3) | 40 CFR Parts 72-78 (July 1, 2006) | * | |
| 244-1.2(b)(3) | Clean Air Act 42 U.S.C. Section 7651-7651o (2000) | * | |
| 244-1.2(b)(12) | 40 CFR 51.123(o)(1) and (2) and (p) (July 1, 2006) | * | |
| 244-1.2(b)(12) | 40 CFR 97.188 (July 1, 2006) | * | |
| 244-1.2(b)(12) | 40 CFR 97 subpart EE (July 1, 2006) | * | |
| 244-1.2(b)(17) | 40 CFR 51.123(o)(1) and (2) and (p) (July 1, 2006) | * | |
| 40 CFR 52.35 (July 1, 2006) | * | ||
| 40 CFR 97.101-188 (July 1,2006) | * | ||
| 244-1.2(b)(20) | 40 CFR 51.123, 40 CFR Part 97 | * | |
| 40 CFR Part 52.35 (July 1, 2006) | * | ||
| 244-1.2(b)(25) | 40 CFR 51.124 (July 1, 2006) | * | |
| 40 CFR 52.36 (July 1, 2006) | * | ||
| 40 CFR 97.201-288 (July 1, 2006) | * | ||
| 244-1.2(b)(35) | 40 CFR 75 (July 1, 2006) | * | |
| 244-1.2(b)(35)(iv) | 40 CFR 75 (July 1, 2006) | * | |
| 244-1.2(b)(49) | 40 CFR 75 (July 1, 2006) | * | |
| 244-1.2(b)(58) | 40 CFR 75.22 (July 1, 2006) | * | |
| 244-1.2(b)(63) | Clean Air Act 42 U.S.C. Section 7429(g)(1) (2000) | * | |
| 244-1.2(b)(64) | Clean Air Act 42 U.S.C. Section 7661a(c) (2000) | * | |
| 244-1.2(b)(65) | 40 CFR 51.123(o)(1) (2) (July 1,2006) | * | |
| 244-1.6(d)(1) | Clean Air Act 42 U.S.C. Section 7401 - 7671(q) (2000) | * | |
| 244-1.6(d)(2) | Clean Air Act 42 U.S.C. Section 7401 - 7671(q) (2000) | * | |
| 244-1.8 | 40 CFR Part 78 (July 1, 2006) | * | |
| 244-6.5(d)(2) | Clean Air Act 42 U.S.C. Section 7401 - 7671(q) (2000) | * | |
| 244-8.1 | 40 CFR Part 75 (July 1, 2006) | * | |
| 40 CFR 72.2 (July 1, 2006) | * | ||
| 244-8.1(a)(1) | 40 CFR Part 75 (July 1, 2006) | * | |
| 244-8.1(a)(2) | 40 CFR Part 75 (July 1, 2006) | * | |
| 244-8.1(c) | 40 CFR Part 75 (July 1, 2006) | * | |
| 244-8.1(d)(2) | 40 CFR Part 75 (July 1, 2006) | * | |
| 244-8.1(d)(3) | 40 CFR Part 75 (July 1, 2006) | * | |
| 244-8.1(d)(4)(ii) | 40 CFR Part 75 (July 1, 2006) | * | |
| 244-8.1(e) | 40 CFR Part 75 (July 1, 2006) | * | |
| 244-8.2(a)(1) | 40 CFR Part 75 (July 1, 2006) | * | |
| 244-8.2(a)(2) | 40 CFR Part 75 (July 1, 2006) | * | |
| 244-8.2(c) | 40 CFR Part 75 (July 1, 2006) | * | |
| 244-8.2(d) | 40 CFR Part 75 (July 1, 2006) | * | |
| 244-8.2(d)(1) | 40 CFR 75.20 (July 1, 2006) | * | |
| 244-8.2(d)(2) | 40 CFR Part 75 (July 1, 2006) | * | |
| 244-8.2(d)(3) | 40 CFR Part 75 (July 1, 2006) | * | |
| 244-8.2(d)(3)(ii) | 40 CFR Part 75 (July 1, 2006) | * | |
| 244-8.2(d)(3)(iii) | 40 CFR Part 75 (July 1, 2006) | * | |
| 244-8.2(d)(3)(iv) | 40 CFR Part 75 (July 1, 2006) | * | |
| 244-8.2(d)(3)(iv)(a) | 40 CFR Part 75 (July 1, 2006) | * | |
| 244-8.2(d)(3)(iv)(c) | 40 CFR Part 75 (July 1, 2006) | * | |
| 244-8.2(d)(3)(v)(a) | 40 CFR Part 75 (July 1, 2006) | * | |
| 244-8.2(d)(3)(v)(a)(1) | 40 CFR 72.2 (July 1, 2006) | * | |
| 244-8.2(d)(3)(v)(a)(2) | 40 CFR Part 75 (July 1, 2006) | * | |
| 244-8.2(d)(3)(v)(a)(3) | 40 CFR Part 75 (July 1, 2006) | * | |
| 244-8.2(d)(3)(v)(a)(4) | 40 CFR Part 75 (July 1, 2006) | * | |
| 244-8.2(d)(3)(v)(a)(5) | 40 CFR 75 Appendix E (July 1, 2006) | * | |
| 40 CFR 72.2 (July 1, 2006) | * | ||
| 244-8.2(e) | 40 CFR Part 75 (July 1, 2006) | * | |
| 244-8.2(f) | 40 CFR Part 75 (July 1, 2006) | * | |
| 244-8.3(a) | 40 CFR Part 75 (July 1, 2006) | * | |
| 244-8.3(b) | 40 CFR Part 75 (July 1, 2006) | * | |
| 244-8.4 | 40 CFR Part 75 (July 1, 2006) | * | |
| 244-8.5(a) | 40 CFR Part 75 (July 1, 2006) | * | |
| 244-8.5(b) | 40 CFR Part 75 (July 1, 2006) | * | |
| 244-8.5(c) | 40 CFR Part 75 (July 1, 2006) | * | |
| 244-8.5(d)(2) | 40 CFR Part 75 (July 1, 2006) | * | |
| 244-8.5(d)(3) | 40 CFR Part 75 (July 1, 2006) | * | |
| 244-8.5(e)(1) | 40 CFR Part 75 (July 1, 2006) | * | |
| 244-8.5(e)(2) | 40 CFR Part 75 (July 1, 2006) | * | |
| 244-8.6(a) | 40 CFR Part 75 (July 1, 2006) | * | |
| 244-8.6(b)(1) | 40 CFR Part 75 (July 1, 2006) | * | |
| 244-8.6(b)(2) | 40 CFR Part 75 (July 1, 2006) | * | |
| 244-9.1(c) | 40 CFR 72.8 (July 1, 2006) | * | |
| 244-9.4(b)(2) | 40 CFR 72.8 (July 1, 2006) | * | |
| 245-1.2(b)(3) | 40 CFR Parts 72 - 78 (July 1, 2006) | * | |
| 245-1.2(b)(3) | Clean Air Act 42 U.S.C. Section 7651-7651o (2000) | * | |
| 245-1.2(b)(4) | 40 CFR 51.124(o)(1) and (2) and (r) (July 1, 2006) | * | |
| 40 CFR 97.288 (July 1, 2006) | * | ||
| 245-1.2(b)(12) | 40 CFR 51.123 (July 1, 2006) | * | |
| 40 CFR 97.101-188 (July 1, 2006) | * | ||
| 40 CFR 52.35 (July 1, 2006) | * | ||
| 245-1.2(b)(14) | 40 CFR 51.123 (July 1, 2006) | * | |
| 40 CFR 97.301-388 (July 1, 2006) | * | ||
| 40 CFR 52.35 (July 1, 2006) | * | ||
| 245-1.2(b)(17) | 40 CFR 51.124(o)(1) (2) (r) (July 1, 2006) | * | |
| 40 CFR 97.288 (July 1, 2006) | * | ||
| 245-1.2(b)(19) | 40 CFR 72.2 (July 1, 2006) | * | |
| 245-1.2(b)(21) | 40 CFR 73 (July 1, 2006) | * | |
| 245-1.2(b)(24) | 40 CFR 51.124 (July 1, 2006) | * | |
| 40 CFR 52.36 (July 1, 2006) | * | ||
| 40 CFR 97.201-288 (July 1, 2006) | * | ||
| 245-1.2(b)(34) | 40 CFR 73.31(a) (b) (July 1, 2006) | * | |
| 245-1.2(b)(35) | 40 CFR Part 75 (July 1, 2006) | * | |
| 245-1.2(b)(35)(iii) | 40 CFR Part 75 (July 1, 2006) | * | |
| 245-1.2(b)(47) | 40 CFR Part 75 (July 1, 2006) | * | |
| 245-1.2(b)(56) | 40 CFR Part 75 (July 1, 2006) | * | |
| 245-1.2(b)(61) | Clean Air Act 42 U.S.C. Section 7429(g)(1) (2000) | * | |
| 245-1.2(b)(62) | Clean Air Act 42 U.S.C. Section 7661a(c) (2000) | * | |
| 245-1.2(b)(63) | 40 CFR 51.124(o)(1) (2) (July 1, 2006) | * | |
| 245-1.6(d)(1) | Clean Air Act 42 U.S.C. Section 7401 - 7671(q) (2000) | * | |
| 245-1.6(d)(2) | Clean Air Act 42 U.S.C. Section 7401 - 7671(q) (2000) | * | |
| 245-1.8 | 40 CFR Part 78 (July 1, 2006) | * | |
| 245-6.4(a)(1) | 40 CFR 73.31(a) (b) (July 1, 2006) | * | |
| 40 CFR 73 Subpart D (July 1, 2006) | * | ||
| 245-6.4(a)(2) | 40 CFR 73 Subpart D (July 1, 2006) | * | |
| 245-6.4(b)(1) | 40 CFR 73(c), 73 Subpart D (July 1, 2006) | * | |
| 245-6.4(b)(2) | 40 CFR 73 Subpart D (July 1, 2006) | * | |
| 245-6.5(b)(1)(i) | 40 CFR 73.35(b) and (c) (July 1, 2006) | * | |
| 245-6.5(b)(1)(ii) | 40 CFR 73.35(d) and 77.5 (July 1, 2006) | * | |
| 245-6.5(c)(2)(ii) | 40 CFR 73 Subpart D (July 1, 2006) | * | |
| 245-6.5(c)(2)(iv) | 40 CFR 73 Subpart D (July 1, 2006) | * | |
| 245-6.5(c)(2)(vi) | 40 CFR 73 Subpart D (July 1, 2006) | * | |
| 245-6.5(d)(2) | Clean Air Act 42 U.S.C. Section 7401 - 7671(q) (2000) | * | |
| 245-7.2(a)(3) | 40 CFR 74.42 (July 1, 2006) | * | |
| 40 CFR 74.47(c) (July 1, 2006) | * | ||
| 245-8.1 | 40 CFR Part 75 (July 1, 2006) | * | |
| 40 CFR 72.2 (July 1, 2006) | * | ||
| 245-8.1(a)(1) | 40 CFR Part 75 (July 1, 2006) | * | |
| 245-8.1(a)(2) | 40 CFR Part 75 (July 1, 2006) | * | |
| 245-8.1(c) | 40 CFR Part 75 (July 1, 2006) | * | |
| 245-8.1(d)(2) | 40 CFR Part 75 (July 1, 2006) | * | |
| 245-8.1(d)(3) | 40 CFR Part 75 (July 1, 2006) | * | |
| 245-8.1(d)(4)(ii) | 40 CFR Part 75 (July 1, 2006) | * | |
| 245-8.1(e) | 40 CFR Part 75 (July 1, 2006) | * | |
| 245-8.2(a)(1) | 40 CFR Part 75 (July 1, 2006) | * | |
| 245-8.2(a)(2) | 40 CFR Part 75 (July 1, 2006) | * | |
| 245-8.2(d) | 40 CFR Part 75 (July 1, 2006) | * | |
| 245-8.2(d)(1) | 40 CFR Part 75 (July 1, 2006) | * | |
| 245-8.2(d)(2) | 40 CFR Part 75 (July 1, 2006) | * | |
| 245-8.2(d)(3) | 40 CFR Part 75 (July 1, 2006) | * | |
| 245-8.2(d)(3)(ii) | 40 CFR Part 75 (July 1, 2006) | * | |
| 245-8.2(d)(3)(iii) | 40 CFR Part 75 (July 1, 2006) | * | |
| 245-8.2(d)(3)(iv) | 40 CFR Part 75 (July 1, 2006) | * | |
| 245-8.2(d)(3)(iv)(a) | 40 CFR Part 75 (July 1, 2006) | * | |
| 245-8.2(d)(3)(iv)(c) | 40 CFR Part 75 (July 1, 2006) | * | |
| 245-8.2(d)(3)(v)(a) | 40 CFR Part 75 (July 1, 2006) | * | |
| 245-8.2(d)(3)(v)(a)(1) | 40 CFR Part 75 (July 1, 2006) | * | |
| 245-8.2(d)(3)(v)(a)(2) | 40 CFR Part 75 (July 1, 2006) | * | |
| 245-8.2(d)(3)(v)(a)(3) | 40 CFR Part 75 (July 1, 2006) | * | |
| 245-8.2(e) | 40 CFR Part 75 (July 1, 2006) | * | |
| 245-8.2(f) | 40 CFR Part 75 (July 1, 2006) | * | |
| 245-8.3(a) | 40 CFR Part 75 (July 1, 2006) | * | |
| 245-8.3(b) | 40 CFR Part 75 (July 1, 2006) | * | |
| 245-8.4 | 40 CFR Part 75 (July 1, 2006) | * | |
| 245-8.5(a) | 40 CFR Part 75 (July 1, 2006) | * | |
| 245-8.5(b) | 40 CFR Part 75 (July 1, 2006) | * | |
| 245-8.5(c) | 40 CFR Part 75 (July 1, 2006) | * | |
| 245-8.5(d)(2) | 40 CFR Part 75 (July 1, 2006) | * | |
| 245-8.5(d)(3) | 40 CFR Part 75 (July 1, 2006) | * | |
| 245-8.5(e)(1) | 40 CFR Part 75 (July 1, 2006) | * | |
| 245-8.5(e)(2) | 40 CFR Part 75 (July 1, 2006) | * | |
| 245-8.6(a) | 40 CFR Part 75 (July 1, 2006) | * | |
| 245-8.6(b) | 40 CFR Part 75 (July 1, 2006) | * | |
| 245-9.1(c) | 40 CFR 72.8 (July 1, 2006) | * | |
| 40 CFR Part 74 (July, 1, 2006) | * | ||
| 245-9.4(b)(2) | 40 CFR 72.8 (July, 1, 2006) | * | |
| 245-9.4(b)(3) | 40 CFR Part 74 (July 1, 2006) | * | |