Actions Requiring Further Review Under SEQR
Type I actions:
A type I action meets or exceeds a threshold contained in the list in section 617.4, or is one on an agency's locally adopted Type I list.
Type I actions:
- are more likely to have a significant adverse impact on the environment than Unlisted Actions
- may require a Draft Environmental Impact Statement. (DEIS)
Unlisted Actions
An action that does not meet or exceed a threshold contained in the Type I list in section 617.4, or one that is on an agency's locally adopted Type I list and is not contained in the Type II list. An Unlisted Action requires a determination of significance and may require preparation of a draft E.I.S.
If your action is a Type 1 or Unlisted Action, proceed to Step 2.





