Annual Summaries of Marine Artificial Reef Activity
The following tables summarize the patch reef building activity on the marine artificial reef sites. Each table displays the reef site, month of deployment, material, and deployment coordinates in latitude and longitude for a specific calendar year. The corner coordinates for each reef site are also available as LORAN C TD's and latitude and longitude coordinates.
Artificial Reefs Built in 2004
| Reef Site | Month | Material |
Coordinates )LatitudeLongitude |
|---|---|---|---|
| Atlantic Beach | January | 15,400 cubic yards of red shale | Multiple coordinates available upon request |
| Shinnecock | February | 720 tons of jetty stone | 40°48.170'N 72°28.360'W |
| Shinnecock | March | 1,010 tons of jetty stone | 40°48.171'N 72°28.356'W |
| Shinnecock | March | 705 tons of jetty stone | 40°48.180'N 72°28.330'W |
| Fishing Line Reef McAllister Grounds |
May | 27 foot steel hull workboat, Evan Miller |
40°32.141'N 73°39.595'W |
| Fisherman Yellowbar |
May | 60 foot steel deck barge, CorEW33 |
40°37.994'N 73°14.465'W |
| Shinnecock | June | 8 tons of concrete buoy anchors | 40°48.137'N 72°28.404'W |
| Shinnecock | June | 10 tons of concrete buoy anchors | 40°48.092'N 72°28.412'W |
| Moriches | June | 77 foot steel hull fishing vessel, Vickey | 40°43.374'N 72°46.564'W |
Artificial Reefs Built in 2003
| Reef Site | Month | Material | Coordinates (Latitude Longitude) |
|---|---|---|---|
| Fishing Line McAllister Grounds |
April | Hancock Barge, a 37-foot steel crane barge | 40°32.159'N 73°39.468'W |
| Fire Island | October | Mary N, a 50-foot steel clam dredge | 40°35.997'N 73°12.926'W |
| Fire Island | October | Alec N, a 45-foot steel clam dredge | 40°35.962'N 73°13.011'W |
| Moriches | November | J.J., a 90-foot steel Reinhauer tugboat | 40°43.475'N 72°46.474'W |
| Atlantic Beach | December | 33,600 cubic yards red shale from the Howland Hook Wharf extension project | Coordinates available upon request. |
| Reef Site | Month | Material | Coordinates (Latitude Longitude) |
|---|---|---|---|
| Fishing Line McAllister Grounds |
December 2001 | 8,900 cubic yards of Red Shale | 40°32.290'N 73°39.680'W |
| Moriches | April | 167 foot steel vessel The Boat | 40°43.403'N 72°46.659'W |
| Fisherman Yellowbar |
May | 48 foot vessel Peregrine | 40°38.012'N 73°14.364'W |
| Moriches | July | 80 foot steel trawler Ana Palmira | 40°43.514'N 72°46.598'W |
| Reef Site | Month | Material | Coordinates (Latitude Longitude) |
|---|---|---|---|
| Atlantic Beach (73*) | January - June | 179,900 cubic yards of bedrock | Scattered over site |
| Fisherman Yellowbar |
January | 62-ft fishing vessel, Connie F | 40°38.000'N 73°14.490'W |
| Moriches | February | 100-ft steel deck barge | 40°43.470'N 72°46.329'W |
| Moriches | October | 70-ft steel trawler, Two Friends | 40°43.473'N 72°46.474'W |
* Number reflects individual dredge rock deployments
Note: Total number of reef deployments: 76
| Reef Site | Month | Material | Coordinates (Latitude Longitude) |
|---|---|---|---|
| Atlantic Beach | February to December | 254,000 cubic yards of dredged bedrock | Scattered over site |
| Fishing Line McAllister Grounds |
June | Concrete bridge sections | 40°32.188'N 73°39.495'W |
| Fishing Line McAllister Grounds |
July | Concrete bridge sections | 40°32.195'N 73°39.508'W |
| Fishing Line McAllister Grounds |
August | Concrete bridge sections | 40°32.199'N 73°39.497'W |
| Fishing Line McAllister Grounds |
September | 28 foot steel workboats and two 40 foot steel dredge barges | 40°32.101'N 73°39.454'W |
| Fishing Line McAllister Grounds |
November | 43 foot bi-metal sailboat, Beyond | 40°32.150'N 73°39.333'W |
| Hempstead Town | October | Two 40 foot steel dredge barges | 40°31.020'N 73°32.510'W |
| Fisherman Yellowbar |
November | 12 inch concrete pipe (67 pieces) 15 inch concrete pipe (19 pieces) eight foot section |
40°38.000'N 73°14.441'W |
| Moriches | March | 112 foot steel clam dredge, Cape Fear | 40°43.505'N 72°46.386'W |
| Moriches | July | 18 to 30 inch concrete pipe (115 pieces), eight foot sections | Scattered over site |
| Shinnecock | February and March | 3,500 cubic yards of concrete bridge sections | Scattered over site |