Wyoming County - The Town of Eagle Town Board, as lead agency, has accepted a Final Environmental Impact Statement on the proposed Wind Mill Project. The action involves the construction and operation of an approximately 100 megawatt (MW) wind energy park in the Town of Eagle, including the installation and operation of 67 wind turbines within an approximately 5071-acre area, construction and use of 16 miles of access roads, construction and use of an electrical collection system with approximately 7.1 miles of overhead lines and 16.7 miles of underground lines, construction and use of a new substation on a 1.5-acre parcel that will tie into an existing 115-kV line, and construction and use of a 5.5 mile overhead transmission line that will connect to the newly constructed substation and an existing substation in the Town of Arcade, NY.

Contact: Joseph Kushner, Town of Eagle, 3560 Main Street, Bliss, NY 14066, phone: (585) 322-7730, fax: (585) 322-9276.