| Region 9 SEQR and Other Notices | Region 9 SPDES Renewals |
ENB Region 9 Completed Applications 07/19/2006 |
Erie County |
|
| Applicant: | Mark Sadkowski |
|---|---|
| Facility: |
Sadkowski Property 51 Jen Ct Grand Island, NY 14072 |
| Application ID: | 9-1446-00600/00001 |
| Permit(s) Applied for: |
Article 24 Freshwater Wetlands |
| Project is Located: | Grand Island, Erie County |
| Project Description: | |
|
Installation of a 24foot
round above ground pool with an associated deck (6' X 16') to be
built using 4"x4" posts, within the first 50 feet of the 100 foot regulated adjacent area
of
Freshwater Wetland TW-9.
|
|
| State Environmental Quality Review (SEQR) Determination: | |
| Project is not subject to SEQR because it is a Type II action. | |
| SEQR Lead Agency: | |
| None Designated | |
| State Historic Preservation Act (SHPA) Determination: | |
| Cultural resource lists and map have been checked. No registered, eligible or inventoried archaeological sites or historic structures were identified at the project location. No further review in accordance with SHPA is required. | |
| Coastal Management: | |
| This project is not located in a Coastal Management area and is not subject to the Waterfront Revitalization and Coastal Resources Act. | |
| Opportunity for Public Comment: | |
| Comments on this project must be submitted in writing to the Contact Person no later than Aug 4 2006. | |
| Contact: | Steven J Miller NYSDEC Region 9 Headquarters 270 Michigan Ave Buffalo, NY 14203 (716)851-7165 r9dep@gw.dec.state.ny.us |
Niagara County |
|
| Applicant: | NYS Electric & Gas Corp 18 Link Dr PO Box 5224 Binghamton, NY 13902 -5224 |
| Facility: |
Lockport Road Gas Main Southern Row of Lockport Rd Between Campbell & Comstock Pendleton, NY |
| Application ID: | 9-2932-00084/00001 |
| Permit(s) Applied for: |
Article 24 Freshwater Wetlands |
| Project is Located: | Pendleton, Niagara County |
| Project Description: | |
|
The applicant proposes to
install approximately 7,285 feet of six inch gas main on the
south side of Lockport Road (within the right-of-way) from Campbell Boulevard to
Comstock Road in order to maintain adequate pressures in the area. The gas main would
go through state regulated freshwater wetland CB-2 (Class II) and its regulated 100 foot
wide adjacent area.
|
|
| State Environmental Quality Review (SEQR) Determination: | |
| Project is not subject to SEQR because it is a Type II action. | |
| SEQR Lead Agency: | |
| None Designated | |
| State Historic Preservation Act (SHPA) Determination: | |
| Cultural resource lists and map have been checked. No registered, eligible or inventoried archaeological sites or historic structures were identified at the project location. No further review in accordance with SHPA is required. | |
| Coastal Management: | |
| This project is not located in a Coastal Management area and is not subject to the Waterfront Revitalization and Coastal Resources Act. | |
| Opportunity for Public Comment: | |
| Comments on this project must be submitted in writing to the Contact Person no later than Aug 4 2006. | |
| Contact: | Douglas E Borschel NYSDEC Region 9 Headquarters 270 Michigan Ave Buffalo, NY 14203 (716)851-7165 r9dep@gw.dec.state.ny.us |