ENB Region 8 Completed Applications 06/28/2006 |
Livingston County |
|
| Applicant: | Village of Nunda 1 Mill St PO Box 537 Nunda, NY 14517 -0537 |
|---|---|
| Facility: |
Nunda - V Permissive Service Area Village Wide Nunda, NY |
| Application ID: | 8-2440-00046/00004 |
| Permit(s) Applied for: |
Article 15 Title 15 Water Supply |
| Project is Located: | Nunda, Livingston County |
| Project Description: | |
|
The Department has received
an application from the Village of Nunda to take a backup
supply of water estimated to average 130,000 gallons per day for use in an existing
distribution system by the installation of a 150 gallon per minute well. The Department
has made a tentative determination to approve this application. As a tentative
determination, the Department is seeking public comments prior to making a final
decision on permit issuance.
|
|
| State Environmental Quality Review (SEQR) Determination: | |
| Project is a Type I action and will not have a significant effect on the environment. A coordinated review with other agencies was performed and a Negative Declaration is on file. | |
| SEQR Lead Agency: | |
| Nunda Village Board | |
| State Historic Preservation Act (SHPA) Determination: | |
| A cultural resources survey has been completed. Based on information provided in the survey report, the New York State Office of Parks, Recreation and Historic Preservation (OPRHP) has determined that the proposed activity will have no impact on registered or eligible archaeological sites or historic structures. No further review in accordance with SHPA is required. | |
| Coastal Management: | |
| This project is not located in a Coastal Management area and is not subject to the Waterfront Revitalization and Coastal Resources Act. | |
| Opportunity for Public Comment: | |
| Comments on this project must be submitted in writing to the Contact Person no later than Jul 14 2006. | |
| Contact: | Lisa M Porter NYSDEC Region 8 Headquarters 6274 East AVON-LIMA Rd Avon, NY 14414 (585)226-2466 r8dep@gw.dec.state.ny.us |
Orleans County |
|
| Applicant: | Paul Jennings |
| Facility: |
Jennings Property 16705 Banner Beach Rd Kendall, NY 14476 |
| Application ID: | 8-3430-00139/00001 |
| Permit(s) Applied for: |
Article 15 Title 5 Excavation & Fill in Navigable Waters |
| Project is Located: | Kendall, Orleans County |
| Project Description: | |
|
The applicant proposes to
install a 120 foot rock revetment along the Mean High Water
Level of Lake Ontario. The proposed revetment will include 4 ton toe stone and 1-3 ton
rock rip rap on a 1 on 2 slope. The project is located on Banner Beach Road along Lake
Ontario in the Town of Kendall, Orleans County.
|
|
| State Environmental Quality Review (SEQR) Determination: | |
| Project is an Unlisted Action and will not have a significant impact on the environment. A Negative Declaration is on file. A coordinated review was not performed. | |
| SEQR Lead Agency: | |
| None Designated | |
| State Historic Preservation Act (SHPA) Determination: | |
| Cultural resource lists and map have been checked. No registered, eligible or inventoried archaeological sites or historic structures were identified at the project location. No further review in accordance with SHPA is required. | |
| Coastal Management: | |
| This project is not located in a Coastal Management area and is not subject to the Waterfront Revitalization and Coastal Resources Act. | |
| Opportunity for Public Comment: | |
| Comments on this project must be submitted in writing to the Contact Person no later than Jul 14 2006. | |
| Contact: | Jenny A Landry NYSDEC Region 8 Headquarters 6274 East AVON-LIMA Rd Avon, NY 14414 (585)226-2466 r8dep@gw.dec.state.ny.us |
Steuben County |
|
| Applicant: | Corning Inc HP-ME-02-50 Corning, NY 14831 |
| Facility: |
Corning Inc Sullivan Park One Science Center DR|END of Co Rte 107 Painted Post, NY 14870 |
| Application ID: | 8-4642-00011/00046 |
| Permit(s) Applied for: |
Article 19 Air State Facility |
| Project is Located: | Erwin, Steuben County |
| Project Description: | |
|
The Department has received an application
for an initial State Facility Permit for the existing
Sullivan Park research and development facility, located on County Road 107 in the Town of
Erwin. The facility emits air contaminants from glass production operations and process boilers.
The Department has generated a Draft Permit based on the application materials received.
Corning Inc has proposed operational limits
to restrict potential facility emissions to below the 6
NYCRR Part 201-6 (Title V) applicability thresholds for a Major Stationary Source. In response,
the Draft Permit has conditions based on material use, fuel use, and appropriate emission factors,
to limit facility emissions:
C of
carbon monoxide (CO), sulfur dioxide (SO2), oxides of nitrogen (NOX), particulate
matter
smaller than 10 microns (PM-10), and total particulate matter (PM), to a maximum of 99.9
tons per year each, below their 100 ton per year thresholds;
C of
volatile organic compounds (VOC), to a maximum of 49.9 tons per year, below their 50 ton
per year threshold;
C of
hazardous air pollutants (HAP) hydrogen chloride (HCl), hydrogen fluoride (HF), and
chlorine (Cl2), to a maximum of 9.9 tons per year each, below their 10 ton per year
thresholds; and
C of
all HAP substances combined, to a maximum of 24.9 tons per year, below their 25 ton per
year threshold.
In addition, the Draft Permit limits facility
arsenic emissions from glass production and research
operations to 34.9 pounds per year.
Facility emission processes include operation
of two 46.7 million BTU per hour natural gas fired
boilers that can burn number 2 fuel oil as backup, sodium hydroxide and hydrochloric acid storage
tanks, acrylate coating processes, batch mixing and specialty glass production operations,
hydrofluoric acid bath platinum crucible cleaning operations, fiber optic production, drying
operations, process cleanup and maintenance vacuum systems, and two research and
development continuous glass melters.
Compliance verification includes operation
of emission control equipment, maintenance of
operation logs for the boilers, melters, and emission control equipment, and calculations of 12
month rolling totals of emissions. These records are to be maintained at the facility for a minimum
of five years and must be made available with all supporting data to Department inspectors upon
request.
The application and Draft Permit are available
for review at the Region 8 NYSDEC office. The
Draft Permit may be viewed or downloaded as a .pdf file at:
http://www.dec.state.ny.us/website/dardata/boss/afs/draft_asf.html .
|
|
| State Environmental Quality Review (SEQR) Determination: | |
| Project is an Unlisted Action and will not have a significant impact on the environment. A Negative Declaration is on file. A coordinated review was not performed. | |
| SEQR Lead Agency: | |
| None Designated | |
| State Historic Preservation Act (SHPA) Determination: | |
| Cultural resource lists and map have been checked. No registered, eligible or inventoried archaeological sites or historic structures were identified at the project location. No further review in accordance with SHPA is required. | |
| Coastal Management: | |
| This project is not located in a Coastal Management area and is not subject to the Waterfront Revitalization and Coastal Resources Act. | |
| Opportunity for Public Comment: | |
| Comments on this project must be submitted in writing to the Contact Person no later than Jul 31 2006. | |
| Contact: | Roger T McDonough NYSDEC Region 8 Headquarters 6274 East AVON-LIMA Rd Avon, NY 14414 (585)226-2466 r8dep@gw.dec.state.ny.us |