ENB - REGION 9 NOTICES

Completed Applications
Consolidated SPDES Renewals

Notice Of Acceptance Of Draft EIS

Wyoming County - The Town Board of the Town of Eagle, as lead agency, has accepted a Draft Environmental Impact Statement on the proposed Wind Mill Project. Written comments on the Draft EIS will be accepted until May 31, 2006. The action involves the construction and operation of an approximately 100 megawatt (MW) wind energy park in the Town of Eagle, including the installation and operation of 67 wind turbines within an approximately 5071- acre area, construction and use of 16 miles of access roads, construction and use of an electrical collection system with approximately 11 miles of overhead lines and 18 miles of underground lines, construction and use of a new substation on a 1.5-acre parcel that will tie into an existing 115-kV line, and construction and use of a 5.5 mile overhead transmission line that will connect to the newly constructed substation and an existing substation in the Town of Arcade, NY.

Contact: Joseph Kushner, Town of Eagle, 3560 Main Street, Bliss, NY 14066, phone: (585) 322-7730, fax: (585) 322-9276.