| Applicant: | NYS Dept of Transportation 50 Wolf Rd Albany, NY 12232 |
|---|---|
| Facility: |
Roslyn Viaduct Northern Boulevard AT|HEMPSTEAD HARBOR/ROSLYN Creek Roslyn, NY 11576 |
| Application ID: | 1-2822-01336/00001 |
| Permit(s) Applied for: |
Article 25 Tidal Wetlands Section 401 - Clean Water Act Water Quality Certification |
| Project is Located: | North Hempstead, Nassau County |
| Project Description: | |
|
The applicant proposes to
reconstruct the Roslyn Viaduct which carries Route 25A
(Northern Boulevard) over Hempstead Harbor. The total length of the project is
approximately 7,392,' including 2,146' of bridge structure and 5,246' of highway
approach roadway. The project will extend from Fernwood Lane on the west side of the
harbor to Forest Drive on the east side. The reconstructed bridge will be 13' wider than
the existing bridge. Shoulder areas will be widened, but no traffic lanes will be added.
Material for the new bridge and debris from the demolition of the existing bridge will be
transported via barges through the harbor. Approximately 90 feet of bulkhead is proposed
to be replaced within 34" of an existing bulkhead along the western shoreline of
Hempstead Harbor in the area of the Viaduct. New stormwater controls will be installed,
and an area of new wetlands will be created north of the Viaduct. The construction phase
of the project is expected to last 26 months. The purpose of the project is to replace a
deteriorated bridge with an improved design in order to serve the current and future needs
of the traveling public. The project is located at the junction of 25A (Northern
Boulevard) and Hempstead Harbor in the Village of Roslyn, Town of North Hempstead
in Nassau County.
|
|
| State Environmental Quality Review (SEQR) Determination: | |
| Project is not subject to SEQR because it is a Type II action. | |
| SEQR Lead Agency: | |
| None Designated | |
| State Historic Preservation Act (SHPA) Determination: | |
| The proposed activity is not subject to review in accordance with SHPA. The permit type is exempt or the activity is being reviewed in accordance with federal historic preservation regulations. | |
| Coastal Management: | |
| This project is located in a Coastal Management area and is subject to the Waterfront Revitalization and Coastal Resources Act. | |
| Opportunity for Public Comment: | |
| Comments on this project must be submitted in writing to the Contact Person no later than Apr 22 2005. | |
| Contact: | Sherri L Aicher NYSDEC Region 1 Headquarters SUNY @ Stony Brook Building 40 Stony Brook, NY 11790 (631)444-0365 r1dep@gw.dec.state.ny.us |
Suffolk County |
|
| Applicant: | Christopher Whittle |
| Facility: |
Christopher Whittle Property West End of Briar Patch La Village of East Hamp East Hampton, NY |
| Application ID: | 1-4724-00079/00003 |
| Permit(s) Applied for: |
Article 24 Freshwater Wetlands Article 25 Tidal Wetlands |
| Project is Located: | East Hampton, Suffolk County |
| Project Description: | |
|
Subdivide an 11.19 acre
parcel into two residential lots. The property contains or is near
regulated
freshwater wetland #EH-31
and EH31, and regulated tidal wetlands. The site is located
at Briar
Patch Road, East Hampton,
Town of East Hampton, Suffolk County, SCTM #301-12-4-20.3 & 11.6.
|
|
| State Environmental Quality Review (SEQR) Determination: | |
| Project is an Unlisted Action and will not have a significant impact on the environment. A Negative Declaration is on file. A coordinated review was not performed. | |
| SEQR Lead Agency: | |
| None Designated | |
| State Historic Preservation Act (SHPA) Determination: | |
| The proposed activity is not subject to review in accordance with SHPA. The permit type is exempt or the activity is being reviewed in accordance with federal historic preservation regulations. | |
| Coastal Management: | |
| This project is located in a Coastal Management area and is subject to the Waterfront Revitalization and Coastal Resources Act. | |
| Opportunity for Public Comment: | |
| Comments on this project must be submitted in writing to the Contact Person no later than Apr 22 2005. | |
| Contact: | Kelly Ann Felice NYSDEC Region 1 Headquarters SUNY @ Stony Brook Building 40 Stony Brook, NY 11790 (631)444-0365 r1dep@gw.dec.state.ny.us |
| Region 1 SEQR and Other Notices | Region 1 SPDES Renewals |