ENB Region 5 Completed Applications 08/06/2003 |
Essex County |
|
| Applicant: | Elizabethtown - T Court St Box 265 Elizabethtown, NY 12932 |
|---|---|
| Facility: |
Elizabethtown Consolidated Water Distrct Rt 9N, Scrabble Hollow Rd, Water St, Cross St, Noble Terrace Elizabethtown, NY 12932 |
| Application ID: | 5-1524-00044/00003 |
| Permit(s) Applied for: |
Section 401 - Clean Water Act Water Quality Certification Article 15 Title 15 Water Supply Article 15 Title 5 Stream Disturbance |
| Project is Located: | Elizabethtown, Essex County |
| Project Description: | |
|
Proposed improvements to
the Elizabethtown Consolidated Water District. The project
includes a new groundwater source (taking up to 250 gallons per minute), a new storage
tank, and 3,500 feet of transmission main to connect the new source with the existing
groundwater source. Three water main stream crossings of The Branch and Tannery
Brook (class AA(T)) are also proposed. The new well site is located between NYS Route
9N and Scrabble Hollow Road, Town of Elizabethtown.
|
|
| State Environmental Quality Review (SEQR) Determination: | |
| Project is an Unlisted Action and will not have a significant impact on the environment. A Negative Declaration is on file. A coordinated review was performed. | |
| SEQR Lead Agency: | |
| Elizabethtown Town Board | State Historic Preservation Act (SHPA) Determination: |
| The proposed activity is not subject to review in accordance with SHPA. The permit type is exempt or the activity is being reviewed in accordance with federal historic preservation regulations. | |
| Coastal Management: | |
| This project is not located in a Coastal Management area and is not subject to the Waterfront Revitalization and Coastal Resources Act. | |
| Opportunity for Public Comment: | |
| Comments on this project must be submitted in writing to the Contact Person no later than Aug 22 2003. | |
| Contact: | W Richard Speidel NYSDEC Region 5 Warrensburg SUB-OFFICE 232 Hudson St Ext Warrensburg, NY 12885 (518)623-1281 wrspeide@gw.dec.state.ny.us |
Franklin County |
|
| Applicant: | Al Dunham |
| Facility: |
Al Dunham Property on Lake Flower 52 Duprey St Saranac Lake, NY |
| Application ID: | 5-1646-00289/00001 |
| Permit(s) Applied for: |
Section 401 - Clean Water Act Water Quality Certification Article 15 Title 5 Excavation & Fill in Navigable Waters |
| Project is Located: | Harrietstown, Franklin County |
| Project Description: | |
|
Applicant proposes to replace
existing deterioriated railroad ties (along 235' of shoreline)
and rock rip rap (along 90' of shoreline) with 325' of rock rip rap, backed by filter fabric
to further protect the bank from erosion. A total of approx. 40 tons of rip rap will be
installed by hand. The existing rip rap will be reused where possible. Removal of
existing retaining wall will occur in 50' increments with a mini-excavator. The project is
located along Lake Flower at 52 Duprey Street, Saranac Lake.
|
|
| State Environmental Quality Review (SEQR) Determination: | |
| Project is an Unlisted Action and will not have a significant impact on the environment. A Negative Declaration is on file. A coordinated review was not performed. | |
| SEQR Lead Agency: | |
| None Designated | State Historic Preservation Act (SHPA) Determination: |
| Cultural resource lists and map have been checked. No registered, eligible or inventoried archaeological sites or historic structures were identified at the project location. No further review in accordance with SHPA is required. | |
| Coastal Management: | |
| This project is not located in a Coastal Management area and is not subject to the Waterfront Revitalization and Coastal Resources Act. | |
| Opportunity for Public Comment: | |
| Comments on this project must be submitted in writing to the Contact Person no later than Aug 22 2003. | |
| Contact: | Erin L Burns NYSDEC Region 5 Headquarters Rt 86 Ray Brook, NY 12977 (518)897-1234 elburns@gw.dec.state.ny.us |
Washington County |
|
| Applicant: | Fort Ann - T George St Fort Ann, NY 12827 |
| Facility: |
Hadlock Pond Dam Hadlock Pond Rd Fort Ann, NY 12827 |
| Application ID: | 5-5328-00065/00003 |
| Permit(s) Applied for: |
Section 401 - Clean Water Act Water Quality Certification Article 15 Title 5 Dam Article 15 Title 5 Stream Disturbance |
| Project is Located: | Fort Ann, Washington County |
| Project Description: | |
|
Proposed reconstruction
of the Hadlock Pond Dam, to repair the existing deteriorated
spillway and increase hydraulic capacity. The project includes a new fuse plug spillway,
a new 40 foot wide overflow spillway, and embankment improvements. The spillway
elevation will remain the same, with no change to the normal water level of the pond. The
water level will be temporarily lowered during construction. The dam is located at the
southern end of the pond, to the east of Hadlock Pond Road, Town of Fort Ann.
|
|
| State Environmental Quality Review (SEQR) Determination: | |
| Project is not subject to SEQR because it is a Type II action. | |
| SEQR Lead Agency: | |
| None Designated | State Historic Preservation Act (SHPA) Determination: |
| The proposed activity is not subject to review in accordance with SHPA. The permit type is exempt or the activity is being reviewed in accordance with federal historic preservation regulations. | |
| Coastal Management: | |
| This project is not located in a Coastal Management area and is not subject to the Waterfront Revitalization and Coastal Resources Act. | |
| Opportunity for Public Comment: | |
| Comments on this project must be submitted in writing to the Contact Person no later than Aug 22 2003. | |
| Contact: | W Richard Speidel NYSDEC Region 5 Warrensburg SUB-OFFICE 232 Hudson St Ext Warrensburg, NY 12885 (518)623-1281 wrspeide@gw.dec.state.ny.us |