| Region 1 SEQR and Other Notices | Region 1 SPDES Renewals |
ENB Region 1 Completed Applications 07/23/2003 |
Nassau County |
|
| Applicant: | Sba Network Services Inc 5900 Broken Sound Parkway Nw Boca Raton, FL 33487 |
|---|---|
| Facility: |
Sba Network Services Property Lake Avenue Between Richard Place and West Main ST|NCTM# 24-A-21 Oyster Bay, NY 11771 |
| Application ID: | 1-2824-02261/00001 |
| Permit(s) Applied for: |
Article 24 Freshwater Wetlands |
| Project is Located: | Oyster Bay, Nassau County |
| Project Description: | |
|
The applicant proposes to construct a public
utility communications facility consisting of
a 150' tall monopole tower with associated equipment, such as communication cabinets,
to be placed in a 3,725 square foot fenced area surrounding the tower. The project is
located at the Town of Oyster Bay Department of Public Works facility on Lake Avenue,
approximately 1/4 mile south of West Main Street in the Town of Oyster Bay in Nassau
County, NCTM# 024-A-21.
|
|
| State Environmental Quality Review (SEQR) Determination: | |
| Project is an Unlisted Action and will not have a significant impact on the environment. A Negative Declaration is on file. A coordinated review was performed. | |
| SEQR Lead Agency: | |
| NYS Department of Environmental Conservation | State Historic Preservation Act (SHPA) Determination: |
| Cultural resource lists and map have been checked. No registered, eligible or inventoried archaeological sites or historic structures were identified at the project location. No further review in accordance with SHPA is required. | |
| Coastal Management: | |
| This project is not located in a Coastal Management area and is not subject to the Waterfront Revitalization and Coastal Resources Act. | |
| Opportunity for Public Comment: | |
| Comments on this project must be submitted in writing to the Contact Person no later than Aug 8 2003. | |
| Contact: | Sherri L Aicher NYSDEC Region 1 Headquarters SUNY @ Stony Brook Building 40 Stony Brook, NY 11790 (631)444-0365 |
Suffolk County |
|
| Applicant: | Suffolk County Water Authority Mr. Pokorny PO Box 38 Oakdale, NY 11769 -1003 |
| Facility: |
Suffolk Water Authority District Entire Water District Wide Suffolk, NY |
| Application ID: | 1-4700-00010/00594 |
| Permit(s) Applied for: |
Article 17 Titles 7 & 8 Industrial SPDES |
| Project is Located: | , Suffolk County |
| Project Description: | |
|
The Department has made
a tentative determination to approve a State Pollutant
Discharge Elimination System permit under Article 17 of the Environmental
Conservation Law for the removal of iron & manganese from an existing
recharge/collection basin with subsequent discharge to groundwater. This proposed
activity is located at the SCWA Tower Street Wellfield and Pump Station on the east side
of StonyBrook Road, at Pond Path in Lake Grove, Town of Brookhaven, Sufflok County.
SCTM # 200-11-7-12.
This tentative determination
indicates that the discharge regulated under this statute is
considered to satisfy regulator standards for permit issuance based on the information
available to the Department at this time. As a tentative determination, the Department
seeks comments on the proposed regulated activity prior to making a final decision on
permit issuance. As such, this tentative determination does ot signify Department
approval for or endorsement of the activity for which a permit is sought or for the overall
proposed project. Please refer to this application by the application number listed above
and SPDES number NY-0266850. A copy of the application and the draft permit are
available at the Region I Stony Brook office.
|
|
| State Environmental Quality Review (SEQR) Determination: | |
| Project is an Unlisted Action and will not have a significant impact on the environment. A Negative Declaration is on file. A coordinated review was not performed. | |
| SEQR Lead Agency: | |
| None Designated | State Historic Preservation Act (SHPA) Determination: |
| Cultural resource lists and map have been checked. No registered, eligible or inventoried archaeological sites or historic structures were identified at the project location. No further review in accordance with SHPA is required. | |
| Coastal Management: | |
| This project is not located in a Coastal Management area and is not subject to the Waterfront Revitalization and Coastal Resources Act. | |
| Opportunity for Public Comment: | |
| Comments on this project must be submitted in writing to the Contact Person no later than Aug 22 2003. | |
| Contact: | Susan Ackerman NYSDEC Region 1 Headquarters SUNY @ Stony Brook Building 40 Stony Brook, NY 11790 (631)444-0365 svackerm@gw.dec.state.ny.us |
| Applicant: | New York Power Authority 123 Main St White Plains, NY 10601 |
| Facility: |
Brentwood Plant Within Pilgrim State PROPERTY|OFF Sagtikos State Parkway Islip, NY |
| Application ID: | 1-4728-03067/00003 |
| Permit(s) Applied for: |
Article 19 Air Title V Facility |
| Project is Located: | Islip, Suffolk County |
| Project Description: | |
|
NYPA has filed an application
for a federal operating permit under Title V of the Clean
Air Act Amendments of 1990 for its existing facility at the above location. The plant
consists of one GE LM6000 natural gas fired combustion turbines which generate 44
megawatts. The Department has determined the application is complete and has prepared
a draft permit for public review and comment.
In accordance with 6NYCRR
Parts 621.5(d)(9) and 201-6.4(c), the Administrator of the
United States Environmental Protection Agency (USEPA) has the authority to bar
issuance of any Title V Facility Permit if it is determined not to be in compliance with
applicable requirements of the Clean Air Act or 6NYCRR Part 201.
The Department will hold
a legislative public hearing on the application and draft permit.
A legislative public hearing is a proceeding which provides an opportunity for public
comment.
The Department is making
the application, supporting documentation and draft permit
available for public review. Details regarding the locations where the information can be
reviewed and the legislative public hearing can be found at
www.dec.state.ny.us/website/ohms/notices/nypapilgrim.htm
A Notice of Complete
Application for this application that was posted in the 7/16/03 ENB
incorrectly identified the deadline by which comments must be received by the
Department. The correct date is September 26, 2003.
|
|
| State Environmental Quality Review (SEQR) Determination: | |
| Project is not subject to SEQR because it is a Type II action. | |
| SEQR Lead Agency: | |
| None Designated | State Historic Preservation Act (SHPA) Determination: |
| The proposed activity is not subject to review in accordance with SHPA. The permit type is exempt or the activity is being reviewed in accordance with federal historic preservation regulations. | |
| Coastal Management: | |
| This project is not located in a Coastal Management area and is not subject to the Waterfront Revitalization and Coastal Resources Act. | |
| Opportunity for Public Comment: | |
| Comments on this project must be submitted in writing to the Contact Person no later than Sep 26 2003. | |
| Contact: | John J Ferguson NYSDEC Headquarters 625 Broadway Albany, NY 12233 (518)402-9167 jjfergus@gw.dec.state.ny.us |
| Applicant: | Chrisman Properties C/O Bennett & Reed 212 Windmill Lane Southampton, NY 11968 |
| Facility: |
Chrisman Partners 361 Sagaponack ROAD|SCTM 900-89-4-6 Sag Harbor, NY |
| Application ID: | 1-4736-06155/00002 |
| Permit(s) Applied for: |
Article 24 Freshwater Wetlands Article 25 Tidal Wetlands |
| Project is Located: | Southampton, Suffolk County |
| Project Description: | |
|
The applicant proposes the
construction of a new 2-story single family dwelling with
garage, driveway, septic system and private well. The proposal also includes construction
of a swimming pool with associated decks, pool house and landscaping. All structures
will be at least 125 linear feet from NYSDEC regulated Freshwater Wetlands and all
ground disturbance will be at least 50 linear feet from Freshwater Wetlands. All
construction and grading will meet of exceed the required 75 foot setback from NYSDEC
regulated Tidal Wetlands. The proposal is located at 361 Sagaponak Road in Sag Harbor.
SCTM # 900-89-4-6.
|
|
| State Environmental Quality Review (SEQR) Determination: | |
| Project is not subject to SEQR because it is a Type II action. | |
| SEQR Lead Agency: | |
| None Designated | State Historic Preservation Act (SHPA) Determination: |
| Cultural resource lists and map have been checked. No registered, eligible or inventoried archaeological sites or historic structures were identified at the project location. No further review in accordance with SHPA is required. | |
| Coastal Management: | |
| This project is not located in a Coastal Management area and is not subject to the Waterfront Revitalization and Coastal Resources Act. | |
| Opportunity for Public Comment: | |
| Comments on this project must be submitted in writing to the Contact Person no later than Aug 8 2003. | |
| Contact: | Susan Ackerman NYSDEC Region 1 Headquarters SUNY @ Stony Brook Building 40 Stony Brook, NY 11790 (631)444-0365 svackerm@gw.dec.state.ny.us |
| Applicant: | Corazzini Brothers Inc PO Box 1281 Cutchogue, NY 11935 |
| Facility: |
Corazzini Brothers Inc 67240 Rt 25 Main Rd Greenport, NY 11944 |
| Application ID: | 1-4738-00006/00001 |
| Permit(s) Applied for: |
Article 19 Air State Facility |
| Project is Located: | Southold, Suffolk County |
| Project Description: | |
|
The Department has
drafted a permit pursuant to Article 19 (Air Pollution Control) of the NYS
Environmental Conservation Law (ECL) and made a tentative determination to approve this
application for the applicant’s existing asphalt paving process facility. The facility operates a
rotating drum where the asphalt aggregate is dried and mixed with asphalt oil cement. The
asphalt mix produced in the process is routed to a silo for storage and distribution, whereas the
gases and particulate matter produced in the drum are routed through a baghouse for particulate
removal and discharged into the atmosphere through a stack or emission point #1 of the facility.
The facility which is located at 67240 Route 25, Greenport NY is subject to 6NYCRR Part 225-1.2 (Fuel
Composition and Use-Sulfur Limitations), 6NYCRR Part 227-1.3 (Stationary
Combustion Installations-Opacity Limitation), and 40CFR Part 60, Subpart I (Standards of
Performance for Hot Mix Asphalt Facilities). The Permit will cap the emissions of Volatile
Organic Compounds and Nitrogen Oxides by limiting the asphalt mix production to 150,000 tons
per year and by operating the facility with the baseline operating parameters as determined from
emissions testing.
|
|
| State Environmental Quality Review (SEQR) Determination: | |
| Project is an Unlisted Action and will not have a significant impact on the environment. A Negative Declaration is on file. A coordinated review was not performed. | |
| SEQR Lead Agency: | |
| None Designated | State Historic Preservation Act (SHPA) Determination: |
| A Structural-Archaeological Assessment Form has been completed. The proposed activity will not impact on registered, eligible or inventoried archaeological sites or historic structures. | |
| Coastal Management: | |
| This project is not located in a Coastal Management area and is not subject to the Waterfront Revitalization and Coastal Resources Act. | |
| Opportunity for Public Comment: | |
| Comments on this project must be submitted in writing to the Contact Person no later than Aug 22 2003. | |
| Contact: | Marilyn E Peterson NYSDEC Region 1 Headquarters SUNY @ Stony Brook Building 40 Stony Brook, NY 11790 (631)444-0365 mepeters@gw.dec.state.ny.us |