ENB Region 5 Completed Applications 05/03/00

Franklin County
 
Applicant: Franklin County
Rd 2 Constable St Rd
Malone, NY 12953
Office: NYS DEC
Route 86
Ray Brook, NY 12977
(518) 897-1234
Contact: Charles F. Gardephe
SEQR: Project is not subject to SEQR review because it is a Type II action.
SHPA: Cultural resource lists and map have been checked. No registered, eligible or inventoried archaeological sites or historic structures were identified at the project location. No further review in accordance with SHPA is required
Last Filing Date: 05/26/2000
Project Location: Malone
Project Description:
THE APPLICANT IS PROPOSING TO REPLACE THE EXISTING BRIDGE LOCATED ON CR-23/MALONE-CHATEAUGAY ROAD THAT SPANS COLLINS BROOK WITH A NEW STRUCTURE. THE PROJECT INCLUDES REMOVAL OF THE OLD BRIDGE, CONSTRUCTION OF THE NEW STRUCTURE, AND PLACEMENT OF AN ADDITIONAL 200 CU YDS OF STONE FILL FOR SCOUR PROTECTION. THE APPLICATION AND PLANS ARE AVAILABLE FOR REVIEW BY SCHEDULING AN APPOINTMENT WITH THE CONTACT PERSON IDENTIFIED.
Permit: Article 15, Title 5: Stream Protection
Section 401 - Clean Water Act: Water Quality Certification
Permit ID:DEC-5-1648-00179/00001

Saratoga County
 
Applicant: Cayuga Energy Inc
Two Court St
Binghamton, NY 13901
Office: NYS DEC
Hudson Street Extension, Box 220
Warrensburg, NY 12885
(518) 623-3671
Contact: Walter L. Haynes Jr
SEQR: Project is an unlisted action and will not have a significant effect on the environment. A Negative Declaration is on file and a coordinated review with other agencies has been performed.
SHPA: The proposed activity is not subject to review in accordance with SHPA. The permit type is exempt or the activity is being reviewed in accordance with federal historic preservation regulations.
Last Filing Date: 06/09/2000
Project Location: Moreau
Project Description:
The Department has prepared a draft permit in response to the applicants' application to modify the existing Article 19 Title V Facility Permit. The permit modification would allow the simultaneous operation of the auxiliary boiler with the combustion turbines at the applicants'South Glens Falls facility. Special conditions limiting emissions of PSD contaminants have been added to the existing permit to preclude the applicability of PSD regulations to this modifications. The draft permit is available at the Region 5 Warrensburg office by contacting Stephen Barlow, P.E. of the Division of Air Resources.
Permit: Article 19: Title V Facility Permit
Permit ID:DEC-5-4144-00031/00008