The action involves the removal of 221 trees along with their stumps to facilitate the replacement of the Olympic era snowmaking pipeline at Whiteface. This construction project is covered in the approved 2004 Final Environmental Impact Statement, which references the 1996 Unit Management Plan for the Whiteface Mountain Ski Center. Tree cutting will be in compliance with LF Policy # 91-2 on Cutting, Removal or Destruction of Trees and Other Vegetation on Forest Preserve Lands.

The project is located in the Whiteface Mountain Intensive Use Area in the Town of Wilmington, New York,

Contact: Michal Leblanc, ORDA, 5021 Route 86, Wilmington, NY 12997, Phone: (518) 946-2223, E-mail: mleblanc@whiteface.com.


Lake George Park Commission Notice of Availability for Review

County: Washington

Applicant: Heather Alfandre
10 Taymor Trail
Clifton Park, NY 12065

Office: Lake George Park Commission (LGPC)
Box 749
Lake George, NY 12845

LPGC Contact: Joe Thouin

Application Number: 5324-5-17

Application Type: SW2 Major Stormwater Management

Location: 2148 Lands End Road in the Town of Dresden, New York.

Comment Period Ends: August 24, 2017

Project Description: The project involves the construction of a single family home with erosion and stormwater controls.


Negative Declaration

Saratoga County - Saratoga County, as lead agency, has determined that the proposed Zim Smith Mid-County Trail Southern Extension will not have a significant adverse environmental impact. The action involves the construction of 2.74 miles of 10 foot wide asphalt multi use trail that will accommodate bicyclists and pedestrians from the existing Zim Smith Trail termination at Coons Crossing Road in the Town of Halfmoon to the Elizabeth Street Extension in the City of Mechanicville, New York. The trail will utilize trail side ditches and sheet flow to convey stormwater runoff, maintaining existing low points and stream locations. Due to the nature of the proposed trail corridor, there will be areas of large cut and fill quantities with a few retaining walls. Adjacent to the new construction of the Zim Smith Trail adjacent to Coons Crossing Road, a parking lot will be constructed with a landscaped picnic area and bathroom facility. At the end of the proposed trail construction at the bottom of the proposed Mechanicville Bus Garage Driveway, adjacent to Elizabeth Street Extension, a trailhead parking lot will be constructed.

Contact: Ed Snyder, 80 Wolf Road, Suite 300, Albany, NY 12205, Phone: (518) 898-9545, E-mail: esnyder@gpinet.com.


  • Contact for this Page
  • ENB
    NYS DEC
    Division of Environmental Permits
    625 Broadway, 4th Floor
    Albany, NY 12233-1750
    518-402-9167
    Send us an email
  • This Page Covers
  • Page applies to all NYS regions