ENB Region 5 Completed Applications 12/28/2016

Fulton County

Applicant:

Gloversville-Johnstown Joint Sewer Board
191 Union Ave Ext
Johnstown, NY 12095

Facility:

Gloversville-Johnstown Joint WWTP
191 Union Ave
Johnstown, NY 12095

Application ID:

5-1708-00077/00001

Permit(s) Applied for:

Article 17 Titles 7 & 8 Municipal SPDES - Surface Discharge

Project is Located:

Johnstown, Fulton County

Project Description:

The Department of Environmental Conservation (DEC) has prepared a draft permit and has made a tentative determination to issue a renewal to State Pollutant Discharge Elimination Systems (SPDES) permit (NY0026042) for the surface discharge of up to 13 mgd of treated wastewater via Outfall 001 to Cayadutta Creek, a class C water.

The sewage collection system consists of separate sewers. The current treatment consists of screening, grit removal, primary settling, extended aeration, final clarification, and anaerobic digestion. Sludge is digested anaerobically, belt pressed, and landfilled at the Fulton County Solid Waste Facility. The facility accepts and treats wash water from two adjacent dairy processing facilities using a Dissolved Air Floatation Thickener (DAFT). Construction on a Contact Adsorption Settling Technology (CAST) system began to accommodate higher flows and BOD5 loadings. The system utilizes waste activated sludge from the existing aeration process to adsorb the increased organic waste load. When the CAST system is fully operational, the DAFT system will be kept in reserve. Daily processing wastewater sludge will then be combined with the municipal wastewater sludge before being sent to gravity belt thickeners and anaerobic digesters. Whey is introduced to the sludge before entering the digesters. Biogas from the digesters is used to power the facility. Outfall 003 is a sanitary sewer overflow. No treatment is provided at this outfall.This outfall is no longer listed in this permit.

DEC proposes to incorporate the following modifications to this permit: In-stream monitoring requirements have been modified. Parameter limits have been removed. Addition of concentration limits for most parameters that previously only had mass limits. Removal of limits for thallium, Aldrin, BHC, and total phenolics. Addition of total unchlorinated phenols limits. Addition of Mercury limits and a Mercury Minimization plan. Addition of seasonal disinfection requirements, limits for fecal coliform and for total residual chlorine. A Schedule of Compliance for fecal coliform and total residual chlorine has been added. The permit includes the latest general conditions. Details of changes are specified in the draft permit and fact sheet.

Availability of Application Documents:

Filed application documents, and Department draft permits where applicable, are available for inspection during normal business hours at the address of the contact person. To ensure timely service at the time of inspection, it is recommended that an appointment be made with the contact person.

State Environmental Quality Review (SEQR) Determination:

Project is not subject to SEQR because it is a Type II action.

SEQR Lead Agency: None Designated

State Historic Preservation Act (SHPA) Determination:

The proposed activity is not subject to review in accordance with SHPA. The application type is exempt and/or the project involves the continuation of an existing operational activity.

Coastal Management:

This project is not located in a Coastal Management area and is not subject to the Waterfront Revitalization and Coastal Resources Act.

DEC Commissioner Policy 29, Environmental Justice and Permitting (CP-29)

It has been determined that the proposed action is not subject to CP-29.

Opportunity for Public Comment:

Comments on this project must be submitted in writing to the Contact Person no later than Jan 27, 2017.

Contact:

Teresa Diehsner
NYSDEC Headquarters
625 Broadway
Albany, NY 12233
(518)402-9167
DEPPermitting@dec.ny.gov


Saratoga County

Applicant:

Eagle Crest Golf Club Inc.
1004 Ballston Lake Rd
Clifton Park, NY 12065

Facility:

Eagle Crest Golf Club
1004 Ballston Lake Rd
Clifton Park, NY 12065

Application ID:

5-4124-00381/00001

Permit(s) Applied for:

Article 15 Title 15 Water Withdrawal Non-public

Project is Located:

Clifton Park, Saratoga County

Project Description:

The applicant has applied for an initial permit for the continued withdrawal of 325 gallons per minute of water from an irrigation pond and on-site groundwater wells for golf course irrigation. The facility has been in operation since 1963. No changes in current operations from recent years are proposed.

The Department has determined that the Facility is eligible for an Initial Permit under Section 15-1501.9 of the Environmental Conservation Law. Initial Permits are limited to existing facilities for existing water withdrawals over 100,000 gallons per day which were properly reported to the Department prior to February 15, 2012. Section 15-501.9 requires the Department to issue Initial Water Withdrawal Permits for the reported volume.

The Department has determined that the issuance of "initial permits" under ECL section 15-501.9 as implemented by 6 NYCRR 601.7 is a ministerial action and therefore subject to the Type II exemption set out in 6 NYCRR 617.5(c)(19).

Availability of Application Documents:

Filed application documents, and Department draft permits where applicable, are available for inspection during normal business hours at the address of the contact person. To ensure timely service at the time of inspection, it is recommended that an appointment be made with the contact person.

State Environmental Quality Review (SEQR) Determination:

Project is not subject to SEQR because it is a Type II action.

SEQR Lead Agency: None Designated

State Historic Preservation Act (SHPA) Determination:

The proposed activity is not subject to review in accordance with SHPA. The application type is exempt and/or the project involves the continuation of an existing operational activity.

Coastal Management:

This project is not located in a Coastal Management area and is not subject to the Waterfront Revitalization and Coastal Resources Act.

DEC Commissioner Policy 29, Environmental Justice and Permitting (CP-29)

It has been determined that the proposed action is not subject to CP-29.

Opportunity for Public Comment:

Comments on this project must be submitted in writing to the Contact Person no later than Jan 12, 2017.

Contact:

Karyn Hanson
NYSDEC Headquarters
625 Broadway
Albany, NY 12233
(518)402-9167
DEPPermitting@dec.ny.gov


Applicant:

Riverview Construction Associates Inc
Robert Romano
718 River Rd
Rexford, NY 12148

Facility:

Rexford Landing
302 Vischer Ferry Rd
Clifton Park, NY 12065

Application ID:

5-4124-00388/00001

Permit(s) Applied for:

Article 24 Freshwater Wetlands
Section 401 - Clean Water Act Water Quality Certification

Project is Located:

Clifton Park, Saratoga County

Project Description:

Applicant proposes a two-story commercial development of 10,000 s.f. footprint, with a storm water basin proposed to impact approximately 0.28 acre of class 2 wetland N-11 regulated adjacent area. The site is at the corner of Grooms Road and Vischer Ferry Road in the Town of Clifton Park.

Availability of Application Documents:

Filed application documents, and Department draft permits where applicable, are available for inspection during normal business hours at the address of the contact person. To ensure timely service at the time of inspection, it is recommended that an appointment be made with the contact person.

State Environmental Quality Review (SEQR) Determination:

Project is an Unlisted Action and will not have a significant impact on the environment. A Negative Declaration is on file. A coordinated review was not performed.

SEQR Lead Agency: None Designated

State Historic Preservation Act (SHPA) Determination:

Evaluation using a Structural-Archaeological Assessment Form or other information has concluded that the proposed activity will not impact registered, eligible or inventoried archaeological sites or historic structures.

Coastal Management:

This project is not located in a Coastal Management area and is not subject to the Waterfront Revitalization and Coastal Resources Act.

Opportunity for Public Comment:

Comments on this project must be submitted in writing to the Contact Person no later than Jan 12, 2017.

Contact:

Kevin R Bliss
NYSDEC Region 5 Warrensburg Sub-Office
232 Golf Course Rd
Warrensburg, NY 12885
(518)623-1281
DEP.R5@dec.ny.gov


  • Contact for this Page
  • ENB
    NYS DEC
    Division of Environmental Permits
    625 Broadway, 4th Floor
    Albany, NY 12233-1750
    518-402-9167
    Send us an email
  • This Page Covers
  • Page applies to all NYS regions