Madison County

Applicant:

Madison County
Co Office Bldg
Wampsville, NY 13163

Facility:

Hunt Road over Tioughnioga Creek
Hunt Rd - .3 Mi W of Rte 13
Deruyter, NY 13052

Application ID:

7-2524-00293/00001

Permit(s) Applied for:

Article 15 Title 5 Excavation & Fill in Navigable Waters
Article 15 Title 5 Stream Disturbance
Section 401 - Clean Water Act Water Quality Certification

Project is Located:

De Ruyter, Madison County

Project Description:

The Department has made a tentative determination to approve an application for an Excavation Fill, Stream Disturbance, and Water Quality Certification permit to replace the existing single-span bridge carrying Hunt Road over East Branch Tioughnioga River in the Town of DeRuyter. Application and project plans are available for review in the Cortland Office.

Availability of Application Documents:

Filed application documents, and Department draft permits where applicable, are available for inspection during normal business hours at the address of the contact person. To ensure timely service at the time of inspection, it is recommended that an appointment be made with the contact person.

State Environmental Quality Review (SEQR) Determination:

Project is not subject to SEQR because it is a Type II action.

SEQR Lead Agency: None Designated

State Historic Preservation Act (SHPA) Determination:

The proposed activity is not subject to review in accordance with SHPA. The application type is exempt and/or the project involves the continuation of an existing operational activity.

Coastal Management:

This project is not located in a Coastal Management area and is not subject to the Waterfront Revitalization and Coastal Resources Act.

DEC Commissioner Policy 29, Environmental Justice and Permitting (CP-29)

It has been determined that the proposed action is not subject to CP-29.

Opportunity for Public Comment:

Comments on this project must be submitted in writing to the Contact Person no later than Feb 11, 2016.

Contact:

Trendon P Choe
NYSDEC Region 7 Cortland Sub-Office
1285 Fisher Ave
Cortland, NY 13045
(607)753-3095
DEP.R7@dec.ny.gov


Onondaga County

Applicant:

Robert M Hamlin

Facility:

Hamlin Property
1335 West Valley Rd
Preble, NY 13141

Application ID:

7-3152-00280/00005

Permit(s) Applied for:

Article 15 Title 5 Excavation & Fill in Navigable Waters
Section 401 - Clean Water Act Water Quality Certification

Project is Located:

Spafford, Onondaga County

Project Description:

The applicant proposes approximately 260' of erosion control measures to be installed along the shoreline of Otisco Lake. Approximately 195' of angular limestone riprap with native plantings will be interspersed with 65' of a 2-course terraced limestone block wall. All excavated material will be graded and used on-site.

Availability of Application Documents:

Filed application documents, and Department draft permits where applicable, are available for inspection during normal business hours at the address of the contact person. To ensure timely service at the time of inspection, it is recommended that an appointment be made with the contact person.

State Environmental Quality Review (SEQR) Determination:

Project is an Unlisted Action and will not have a significant impact on the environment. A Negative Declaration is on file. A coordinated review was performed.

SEQR Lead Agency: NYS Department of Environmental Conservation

State Historic Preservation Act (SHPA) Determination:

Cultural resource lists and maps have been checked. The proposed activity is not in an area of identified archaeological sensitivity and no known registered, eligible or inventoried archaeological sites or historic structures were identified or documented for the project location. No further review in accordance with SHPA is required.

Coastal Management:

This project is not located in a Coastal Management area and is not subject to the Waterfront Revitalization and Coastal Resources Act.

Opportunity for Public Comment:

Comments on this project must be submitted in writing to the Contact Person no later than Feb 11, 2016.

Contact:

Kristen F Kornak
NYSDEC Region 7 Headquarters
615 Erie Boulevard W
Syracuse, NY 13204
(315)426-7438
DEP.R7@dec.ny.gov


Oswego County

Applicant:

Sithe/Independence Power Partners LP
76 Independence Way
Oswego, NY 13126

Facility:

Independence Station
76 Independence Way
Scriba, NY 13126

Application ID:

7-3556-00040/00026

Permit(s) Applied for:

Article 19 Air Title V Facility

Project is Located:

Scriba, Oswego County

Project Description:

The Department has prepared a draft permit and has made a tentative determination to issue to Sithe/Independence Power Partners a revised Title V permit to authorize the modification of four combustion turbines at Independence Station, Oswego, NY. The facility will increase firing capacity but the changes will not be subject to New Source Review.

The facility consists of four stationary gas turbines (GE MS 7001FA). Block 1 consists of 2 gas turbines. The MW output is a function of ambient temperature and varies from 130 MW in the summer to 170 MW in the winter. Each gas turbine is equipped with a heat recovery steam generator; the two GT/HRSGs supply a single steam turbine (209 MW). Block 2 is of identical configuration to Block 1, consisting of turbines 3 and 4, each with a steam generator, and one steam turbine. The turbines are equipped with dry low NOx combustors and SCR with ammonia injection. The turbines are capable of operating in simple-cycle mode, in which case steam from the HRSG is dumped to a condenser. The NOx limit is 4.5 ppm, the CO limit is 15 ppm.

The permit will authorize the following:

  1. The facility will install GE's 2.6e combustion system: replacement of combustion components in the engine and the turbine's fuel supply train.
  2. The facility will install Advanced Gas Path: replacement of the compressor and replacement of hot gas path components (buckets, nozzles, shrouds).
  3. The facility will install GE's Mark VIe software controls.

The station's MW capacity will increase by as much as 92 MW, and the heat input capacity will increase between 122 and 146 mmBtu/hr for each turbine. The NOx concentration at the exit of the turbine will be reduced from 25 ppm to 9 ppm. This could translate into a lower stack concentration, assuming the SCR is used to its capability, as low as 2 ppm. The proposed modifications to the turbine will render it subject to the 40 CFR Part 60, Subpart KKKK (instead of 40 CFR Part 60, Subpart GG), which is less restrictive than the permit. The heat recovery steam generators are equipped with duct burners that are subject to NSPS Subpart Db. Once the modified turbines become subject to Subpart KKKK, the duct burners will no longer be subject to Db. See 40 CFR 60.4305(b). The changes to the combustor will result in the unit being more efficient. The changes will also increase the capacity by about 146 mmBtu/hr, per unit, and as much as 92 MW facility-wide. The turbines will become subject to 6 NYCRR 251, CO2 performance standards for major electric generating facilities.
In accordance with 6NYCRR Parts 621.7(b)(9) and 201-6.3(c), the Administrator of the United States Environmental Protection Agency (USEPA) has the authority to bar issuance of any Title V Facility Permit if it is determined not to be in compliance with applicable requirements of the Clean Air Act or 6NYCRR Part 201.

Persons wishing to inspect the subject Title V files, including the application with all relevant supporting materials, the draft permit, and all other materials available to the DEC (the "permitting authority") that are relevant to this permitting decision should contact the DEC representative listed below. The Draft Permit and Permit Review Report may be viewed and printed from the Department web site at: http://www.dec.ny.gov/chemical/32249.html.

DEC will evaluate the application and the comments received on it to determine whether to hold a public hearing. Comments and requests for a public hearing should be in writing and addressed to the Department representative listed below. A copy of the Department's permit hearing procedures is available upon request or on the Department web site at: http://www.dec.ny.gov/permits/6234.html.

Availability of Application Documents:

Filed application documents, and Department draft permits where applicable, are available for inspection during normal business hours at the address of the contact person. To ensure timely service at the time of inspection, it is recommended that an appointment be made with the contact person.

State Environmental Quality Review (SEQR) Determination:

Project is an Unlisted Action and will not have a significant impact on the environment. A Negative Declaration is on file. A coordinated review was not performed.

SEQR Lead Agency: None Designated

State Historic Preservation Act (SHPA) Determination:

The proposed activity is not subject to review in accordance with SHPA. The application type is exempt and/or the project involves the continuation of an existing operational activity.

Coastal Management:

This project is not located in a Coastal Management area and is not subject to the Waterfront Revitalization and Coastal Resources Act.

DEC Commissioner Policy 29, Environmental Justice and Permitting (CP-29)

It has been determined that the proposed action is not subject to CP-29.

Opportunity for Public Comment:

Comments on this project must be submitted in writing to the Contact Person no later than Feb 26, 2016.

Contact:

Elizabeth A Tracy
NYSDEC Region 7 Headquarters
615 Erie Boulevard W
Syracuse, NY 13204
(315)426-7438
DEP.R7@dec.ny.gov


  • Contact for this Page
  • ENB
    NYS DEC
    Division of Environmental Permits
    625 Broadway, 4th Floor
    Albany, NY 12233-1750
    518-402-9167
    Send us an email
  • This Page Covers
  • Page applies to all NYS regions