ENB Region 5 Completed Applications 10/23/2013

Clinton County

Applicant:

NYS Dept of Environmental Conservation
625 Broadway
Albany, NY 12233

Facility:

Taylor Pond Dam
Taylor Pond / Silver Lake Rd
Black Brook, NY

Application ID:

5-0926-00120/00003

Permit(s) Applied for:

Section 401 - Clean Water Act Water Quality Certification

Project is Located:

Black Brook, Clinton County

Project Description:

The applicant proposes to rehabilitate the Taylor Pond Dam to bring the dam into compliance with NYSDEC Dam Safety Regulations. The project includes dam crest and embankment modifications and repairs associated with the existing outlet works at the center of the dam. The project consists of five general phases of construction, as follows: 1. Construction Mobilization and Startup: Erosion control and construction access. 2. Dam Embankment Seepage Control Improvements: Install a seepage blanket across the toe of the dam, install two trench drains located at each of the embankment and abutment contacts. 3. Dam Crest and Embankment Modifications: Raising the downstream crest, embankment and existing concrete corewall, and installing a tieback and anchor system to stabilize the raised concrete corewall. 4. Low Level Outlet Modifications: Demolition of the existing gate house, debris removal from intake and within outlet conduit, install new inlet trash racks, install new outlet gates and actuators within the existing outlet structure; raise the outlet structure to the new crest elevations, install operator platform and gate stands. 5. Armoring Upstream Dam Crest and Primary Spillway Channel Grade: Reconstruction and grading the upstream crest, place riprap protection on the upstream dam face and to fill scour damage at the lower primary spillway concrete grade control structure. 6. Construction Demobilization: Remove temporary bridge structure, re-establishing access and stabilizing to preconstruction conditions. This project is also under review by the Adirondack Park Agency #2013-131.

Availability of Application Documents:

Filed application documents, and Department draft permits where applicable, are available for inspection during normal business hours at the address of the contact person. To ensure timely service at the time of inspection, it is recommended that an appointment be made with the contact person.

State Environmental Quality Review (SEQR) Determination:

Project is not subject to SEQR because it is a Type II action.

SEQR Lead Agency: None Designated

State Historic Preservation Act (SHPA) Determination:

Cultural resource lists and map have been checked. No registered, eligible or inventoried archaeological sites or historic structures were identified at the project location. No further review in accordance with SHPA is required.

Coastal Management:

This project is not located in a Coastal Management area and is not subject to the Waterfront Revitalization and Coastal Resources Act.

Opportunity for Public Comment:

Comments on this project must be submitted in writing to the Contact Person no later than Nov 07, 2013.

Contact:

Erin L Burns
NYSDEC Region 5 Headquarters
1115 St Rte 86
Ray Brook, NY 12977
(518)897-1234
dep.r5@dec.ny.gov


Applicant:

Kings Bay Holding Company Inc
Attn: Alain Quintal
4745 Rte 125
Rawdon, QC J0K 1S0

Facility:

Kings Bay Resort
St Rte 9B & Point Au Fer Rd
Rouses Point, NY 12979

Application ID:

5-0928-00053/00012

Permit(s) Applied for:

Article 15 Title 5 Excavation & Fill in Navigable Waters
Article 24 Freshwater Wetlands
Section 401 - Clean Water Act Water Quality Certification

Project is Located:

Champlain, Clinton County

Project Description:

The applicant proposes the installation of approximately 1,220 linear feet of shoreline stabilization on Lake Champlain. The project also includes rip rap protection around 10 trees and the replacement of a culvert. The proposed shoreline stabilization is 1,000' of rock rip rap equaling 800 cubic yards, with four 30'W x12'L granite ramps every 350'-150' to provide a transition area for aquatic life. Approximately 250' of the rip rap, two of the 30' ramps and the culvert replacement are within the 100' adjacent area of NYSDEC Wetland # RP-3. The project is located on Kings Bay Road off of RTE 9B in the Town of Champlain.

Availability of Application Documents:

Filed application documents, and Department draft permits where applicable, are available for inspection during normal business hours at the address of the contact person. To ensure timely service at the time of inspection, it is recommended that an appointment be made with the contact person.

State Environmental Quality Review (SEQR) Determination:

Project is an Unlisted Action and will not have a significant impact on the environment. A Negative Declaration is on file. A coordinated review was not performed.

SEQR Lead Agency: None Designated

State Historic Preservation Act (SHPA) Determination:

Cultural resource lists and map have been checked. No registered, eligible or inventoried archaeological sites or historic structures were identified at the project location. No further review in accordance with SHPA is required.

Coastal Management:

This project is not located in a Coastal Management area and is not subject to the Waterfront Revitalization and Coastal Resources Act.

Opportunity for Public Comment:

Comments on this project must be submitted in writing to the Contact Person no later than Nov 07, 2013.

Contact:

Erin M Donhauser
NYSDEC Region 5 Headquarters
1115 St Rte 86
Ray Brook, NY 12977
(518)897-1234
dep.r5@dec.ny.gov


Saratoga County

Applicant:

Indeck-Energy Services Inc
600 N Buffalo Grove Rd - Ste 300
Buffalo Grove, IL 60089 -2432

Facility:

Indeck-Corinth Energy Center
24 White St
Corinth, NY 12822

Application ID:

5-4126-00028/00009

Permit(s) Applied for:

Article 19 Air Title V Facility
Article 19 Title IV (Phase II Acid Rain)

Project is Located:

Corinth, Saratoga County

Project Description:

The Department has prepared draft permits and made a tentative determination to renew the existing Air Title V and Title IV permits for the Indeck-Corinth Energy Center.

The existing permits have been modified as a result of the repeal of New York State's Nitrogen Oxide (NOx) and Sulfur Dioxide (SO2) budget trading programs. Permit conditions associated with those requirements have been replaced with similar requirements under the CAIRs for NOx ozone season, NOx annual, SO2 and Carbon Dioxide (CO2) budget trading programs.

In accordance with 6NYCRR Parts 621.7(b)(9) and 201-6.3(c), the Administrator of the United States Environmental Protection Agency (USEPA) has the authority to bar issuance of any Title V Facility Permit if it is determined not to be in compliance with applicable requirements of the Clean Air Act or 6NYCRR Part 201.

Persons wishing to inspect the subject Title V files, including the application with all relevant supporting materials, the draft permit, and all other materials available to the DEC (the "permitting authority") that are relevant to this permitting decision should contact the DEC representative listed below. The Draft Permit and Permit Review Report may be viewed and printed from the Department web site at: http://www.dec.ny.gov/chemical/32249.html.

DEC will evaluate the application and the comments received on it to determine whether to hold a public hearing. Comments and requests for a public hearing should be in writing and addressed to the Department representative listed below. A copy of the Department's permit hearing procedures is available upon request or on the Department web site at: http://www.dec.ny.gov/permits/6234.html.

Availability of Application Documents:

Filed application documents, and Department draft permits where applicable, are available for inspection during normal business hours at the address of the contact person. To ensure timely service at the time of inspection, it is recommended that an appointment be made with the contact person.

State Environmental Quality Review (SEQR) Determination:

Project is not subject to SEQR because it is a Type II action.

SEQR Lead Agency: None Designated

State Historic Preservation Act (SHPA) Determination:

The proposed activity is not subject to review in accordance with SHPA. The permit type is exempt or the activity is being reviewed in accordance with federal historic preservation regulations.

Coastal Management:

This project is not located in a Coastal Management area and is not subject to the Waterfront Revitalization and Coastal Resources Act.

Opportunity for Public Comment:

Comments on this project must be submitted in writing to the Contact Person no later than Nov 22, 2013.

Contact:

Beth A Magee
Region 5 Warrensburg Sub-Office
232 Golf Course Rd
Warrensburg, NY 12885
(518)623-1281
dep.r5@dec.ny.gov


  • Contact for this Page
  • ENB
    NYS DEC
    Division of Environmental Permits
    625 Broadway, 4th Floor
    Albany, NY 12233-1750
    518-402-9167
    Send us an email
  • This Page Covers
  • Page applies to all NYS regions