D E C banner
D E C banner

Disclaimer

The New York State Department of Environmental Conservation has added a link to a translation service developed by Microsoft Inc., entitled Bing Translator, as a convenience to visitors to the DEC website who speak languages other than English.

Additional information can be found at DEC's Language Assistance Page.

SCA Water Treatment Plant Supplemental Treatment and Design Work Plan

The Sediment Containment Area (SCA) Water Treatment Plant normally discharges treated effluent to the Metropolitan Syracuse Wastewater Treatment Facility (Metro) for supplemental treatment, prior to discharge to Onondaga Lake. The design average and peak discharge flows are 6.5 and 10 million gallons per day (MGD), respectively. During wet weather events, the hydraulic capacity of the Metro facility may be reached. This periodically results in Metro being unable to receive flow from the SCA Water Treatment Plant. In order to maximize operational up-time for future dredging operations, provisions (supplemental treatment) will be made to facilitate discharge of up to 6.5 MGD of SCA Water Treatment Plant effluent to Onondaga Lake.This discharge is expected to occur only during wet weather shutdowns.

SCA Water Treatment Plant Supplemental Treatment and Design Work Plan (PDF) (25 pages, 2 mB)


  • PDF Help
  • For help with PDFs on this page, please call 315-426-7403.
  • Contact for this Page
  • Division of Environmental Remediation
    625 Broadway
    Albany, NY 12233
    315-426-7403
    Send us an email
  • This Page Covers
  • Page applies to Region 7