NY.gov Portal State Agency Listing Search all of NY.gov
D E C banner
D E C banner

Disclaimer

The New York State Department of Environmental Conservation has added a link to a translation service developed by Microsoft Inc., entitled Bing Translator, as a convenience to visitors to the DEC website who speak languages other than English.

Additional information can be found at DEC's Language Assistance Page.

LCP Bridge Street Site- 2012 Annual Operation, Maintenance and Monitoring Report

This report details the operation, maintenance and monitoring (OM&M) activities conducted at the LCP Bridge Street site in 2012. It provides a summary of the collected data and status of Operation, Maintenance and Monitoring activities.

The remediation of LCP involved a combination of sewer system closure, mercury removal from soil on the former plant property, excavation of impacted sediments in surrounding areas, with relocation to the soil/sediment containment area, construction of an underground cutoff wall and low-permeability soil cover over the soil/sediment containment area, and installation of an on-site groundwater collection system. As part of the project, excavation areas were restored to provide habitats for wading birds, ducks, amphibians, fish, and mammals.

2012 Annual Operation, Maintenance and Monitoring Report LCP Bridge Street , Part I (PDF) (3.2 mB, 66 pages)

2012 Annual Operation, Maintenance and Monitoring Report LCP Bridge Street , Part 2 (PDF) (4.7 mB) (36 pages)


  • PDF Help
  • For help with PDFs on this page, please call 315-426-7403.
  • Contact for this Page
  • Division of Environmental Remediation
    625 Broadway
    Albany, NY 12233
    315-426-7403
    Send us an email
  • This Page Covers
  • Page applies to Region 7