2005 I/M Program Annual Report
Executive Summary
I. Introduction
- A. High Enhanced I/M Program in NYMA
- B. Low Enhanced I/M Program in UPSTATE
- C. TLC OBDII Inspection Program
II. Data Analysis and Reporting
- A. Computerized Network
- B. Test Data Report
- C. Quality Assurance Report
- D. Quality Control Report
- E. Enforcement Program Report
III. Conclusions
Tables
Table II.C.1 Statistics on NYSDMV's Quality Assurance Program - NYMA
Table II.C.2 Statistics on NYSDMV's Quality Assurance Program - UPSTATE
Table II.C.3 Statistics on NYSDMV's Administrative Stops
Table II.D Statistics on NYSDEC's Quality Control Program - NYTEST Equipment Audit
Table II.E Statistics on NYSDMV's Registration Denial Enforcement Program
Graphs
Graph 1 Distribution of NYTEST Inspection Stations in NYMA
Graph 2 Distribution of OBD II Inspection Stations in NYMA
Graph 3 Distribution of OBD II Inspection Stations in Upstate New York
Appendices
- Table A-1: Registered Vehicles in the State of New York
- Table A-2: Emissions Tested Light Duty Vehicles and Light Duty Trucks
Appendix B Summary of OBD II Inspection Results
- Table B-1-a-i: Summary of NYMA OBD II Inspection Results - Light Duty Vehicles
- Table B-1-a-ii: Summary of NYMA OBD II Readiness Status Results -- Light Duty Vehicles
- Table B-1-b-i: Summary of NYMA OBD II Inspection Results - Light Duty Trucks
- Table B-1-b-ii: Summary of NYMA OBDII Readiness Status Results - Light Duty Trucks
- Table B-2-a-i: Summary of Upstate OBD II Inspection Results - Light Duty Vehicles
- Table B-2-a-ii: Summary of Upstate OBD II Readiness Status Results - Light Duty Vehicles
- Table B-2-b-i: Summary of Upstate OBD II Inspection Results - Light Duty Trucks
- Table B-2-b-ii: Summary of Upstate OBD II Readiness Status Results - Light Duty Trucks
- Table B-3-a-i: Summary of TLC Taxi OBD II Inspection Results - Light Duty Vehicles
- Table B-3-a-ii: Summary of TLC Taxi OBD II Readiness Status Results - Light Duty Vehicles
- Table B-3-b-i: Summary of TLC Taxi OBD II Inspection Results - Light Duty Trucks
- Table B-3-b-ii: Summary of TLC Taxi OBD II Readiness Status Results - Light Duty Trucks
Appendix C Summary of NYMA Transient/Idle Test Results
- Table C-1-a: Summary of NYMA Transient Test Results - Light Duty Vehicles
- Table C-1-b: Summary of NYMA Transient Test Results - Light Duty Trucks
- Table C-1-c: Summary of Emission Reductions from Transient Tests
- Table C-2-a: Summary of NYMA Idle Test Results - Light Duty Vehicles
- Table C-2-b: Summary of NYMA Idle Test Results - Light Duty Trucks
- Table C-2-c: Summary of Emission Reductions from Idle Tests
Appendix D Summary of Initial Test Volumes and Failure Rates by Counties
- Table D-1: Summary of Initial Test Volumes and Failure Rates by County in NYMA
- Table D-2: Summary of OBD II Initial Test Volumes and Failure Rates by County in Upstate





