Hazardous Waste Generation Summary Table 2 Sample
For Submittal with a Hazardous Waste Reduction Plan
Sample of Completed Table 2
Company Name: XYZ Manufacturing Company EPA I.D. Number: NYD123456789
| Waste stream ID Number |
Name of waste |
Waste stream affected |
Reduction plans/ projects |
Esti- mated waste reduction /tons |
Method used to calculate *ROI |
*ROI (EST) | Goal date |
Re- marks |
|---|---|---|---|---|---|---|---|---|
| 1 | Ortho- chloro- toluene |
Batch Reactor | 1 (a) install distillation column to recover organic material | 100 | Fall 1997 | |||
| (b) reduce spills by using more instrumentation such as high level interlocks | 5 | Spring 1996 | ||||||
| 2 | Freon | Product Rework | 2 (a) install a vapor recovery system which consists of a steam regenerated activated carbon and distillation column | 10 | Fall 1997 | |||
| (b) investigate possible chemical substitutes for Freon | 10 | PP | 2 Years | Spring 1996 |
*ROI = RATE OF INVESTMENT
AC = ANNUALIZED COST
IRR = INCREASED RATE OF RETURN
NPV = NET PRESENT VALUE
PP = PAYBACK PERIOD
PI = PROFITABILITY INDEX
For a blank copy of the above table please contact:
NYSDEC Division of Solid & Hazardous Materials
Technical Determination Section
(518) 402-8633 or
Download a blank copy of Table 2.(PDF, 4.9KB)


Printer-friendly