Carriage Cleaners Project Schedule

Carriage Cleaners Remedial Investigation Activity Schedule
RI/FS Activity Schedule/Status
Soil Vapor Survey to evaluate the distribution of contaminants and the potential for indoor air intrusion associated with the migration of soil vapors. Completed between March 14 & 16, 2005
Indoor Air Monitoring will be based on the results of the Soil Vapor Survey and performed to evaluate potential human exposure to contaminants known to occur in a dissolved ground water plume. Completed between April 4 & 13, 2005
Subsurface Drilling Program to evaluate the distribution of contaminants, ground water quality, and ground water flow patterns. Completed between May 16 & June 2, 2005
Ground Water Monitoring Program to evaluate subsurface properties, contaminant transport mechanisms, and possible remedial alternatives. Completed July 2005
Follow-Up Indoor Air Monitoring to confirm the results of the initial indoor air sampling event completed in April of 2005. Completed January 2006
Underground Utility Evaluation to assess the potential for preferential migration of contaminants along underground utilities (e.g. storm water and sanitary sewer utilities). The need for this investigation component will be based on the results of ground water sampling. Completed April 2006
Feasibility Study to determine which remedial options will be the most appropriate, cost-effective, and protective of public health and the environment. Planned for Fall and Winter of 2006