Carriage Cleaners Project Schedule
Carriage Cleaners Remedial Investigation Activity Schedule
| RI/FS Activity |
Schedule/Status |
| Soil Vapor Survey to evaluate the distribution of contaminants and the potential for indoor air intrusion associated with the migration of soil vapors. |
Completed between March 14 & 16, 2005 |
| Indoor Air Monitoring will be based on the results of the Soil Vapor Survey and performed to evaluate potential human exposure to contaminants known to occur in a dissolved ground water plume. |
Completed between April 4 & 13, 2005 |
| Subsurface Drilling Program to evaluate the distribution of contaminants, ground water quality, and ground water flow patterns. |
Completed between May 16 & June 2, 2005 |
| Ground Water Monitoring Program to evaluate subsurface properties, contaminant transport mechanisms, and possible remedial alternatives. |
Completed July 2005 |
| Follow-Up Indoor Air Monitoring to confirm the results of the initial indoor air sampling event completed in April of 2005. |
Completed January 2006 |
| Underground Utility Evaluation to assess the potential for preferential migration of contaminants along underground utilities (e.g. storm water and sanitary sewer utilities). The need for this investigation component will be based on the results of ground water sampling. |
Completed April 2006 |
| Feasibility Study to determine which remedial options will be the most appropriate, cost-effective, and protective of public health and the environment. |
Planned for Fall and Winter of 2006 |